My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-126
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:43:25 PM
Creation date
1/10/2017 1:23:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
09/09/2014
Control Number
2014-126
Agenda Item Number
8.A.A.
Entity Name
Close Construction
Subject
Osprey Marsh Stormwater Park
Change Order No.4
PC South Algal Nutrient Removal Facility
Project Number
949
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C04-5 Back up <br />Date: 17 July 2014 <br />Proposal submitted to: <br />Close Construction <br />Attn: Nichole <br />cIā¬mete <br />lectrical <br />LLC <br />Job Location: Job Name: <br />Vero ALGAL <br />Architect: Wandover Date of plans: <br />We hereby submit specifications and estimates for: <br />Electrical work, including labor and materials as per RFI 594-037: <br />1. Remove existing conduit and gear installed for PS #1 MCC <br />Install new U/G conduit and wire to MCC <br />Rebuild and reinstall gear for MCC <br />Labor- $5904.00 <br />2. New MDP and disconnect equipment <br />(4) 3/0 & (1) #6 in 2.5" conduit <br />Misc fittings <br />Material- $11516.00 <br />Labor, equipment and materials furnished shall be warranted for one year. All work to be done <br />according to local and NEC Code. All material is guaranteed as specified. All work to be <br />completed in a work like manner according to standard practices. <br />We propose to furnish material and labor and complete in accordance with above <br />specifications, for the sum of: $1742o.00 <br />Seventeen Thousand Four Hundred Twenty and 00/100 Dollars <br />Payments to be made as follows: Progress Billing <br />Any alteration or deviation from above specifications involving extra costs will be executed only <br />upon written orders, and will become an extra charge over and above the estimate. All <br />agreements are contingent upon strikes, accidents or delays beyond our control. Owner is to carry <br />fire, flood and other necessary insurance. All material is guaranteed as specified. All work to be <br />completed in a work like manner according to standard practices. Note: This proposal may be <br />withdrawn by us if not accepted within 15 days. <br />Acceptance of Proposal- The above prices, specifications and conditions are satisfactory and <br />are hereby accepted. You are authorized to do the work as specified. Payment will be made as <br />outlined above. In the event that it becomes necessary to collect this invoice by suit or otherwise <br />purchaser agrees to pay all costs of collection including attorneys' fee. <br />Signature: Date of Acceptance: <br />13949 61st Lane N <br />West Palm Beach, F133412 <br />561-876-8091 <br />
The URL can be used to link to this page
Your browser does not support the video tag.