Laserfiche WebLink
Change Order Number 4 <br />Item <br />C04-1 Delete transportation charge for sheet piling used at SRCPS $ (750.00) <br />C04-2 Deduct 5' section of precast inlet throat for SRCPS $ (3,690 39) <br />No deduct - Piece has been fabricated. WII deliver to IRC <br />C04-3 F&I 12" PVC flange & 18" long PVC spool piece $ 561 07 <br />See attached breakdown and backup. <br />C04-4 Deduct for failed density tests $ (720 00) <br />See attached backup. <br />C04-5 Revise PS 1 electrical design. $ 19,162.00 <br />See attached breakdown and backup. <br />C04-6 Construct up to (3) 6" wells for recycle water system and connect $ 31,514.11 <br />them in a manifold system and connect to the existing Gorrman-Rupp <br />pump. <br />See attached breakdown and backup. <br />Permit fee for Consumptive Use Permit excluded <br />C04-7 3" gravel packed well $ 3,300.00 <br />See attached breakdown and backup <br />C04-8 Permits RFI 594-025 $ 1,637 86 <br />See attached backup <br />Change Order Subtotal $ 51,014.65 <br />Insurance - 1% $ 510 15 <br />Bond - $11.11 per one thousand $ 566.61 <br />Change Order Total $ 52,091.41 <br />