My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:46:25 PM
Creation date
1/10/2017 1:41:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/16/2014
Control Number
2014-129
Agenda Item Number
8.D.
Entity Name
Dunkelberger Engineering and Testing
Subject
Work Order No. 4
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71Street
Project Number
1137
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Scope and Budget (Revised 8-29-14) <br />Materials Testing and Obsevations <br />Old Dixie Highway Resurfacing Project <br />Indian River County, Florida <br />Attachment A <br />Project Name Old Dixie Hwy Resurfacing IRC Project #1137 <br />Client Indian River County Attn. Mr Michael Nixon, P.E. <br />Dunkelberger Proposal# PHB140131 <br />Date. Revised 8/29/2014 <br />Dunkelberger Engineering & Testing, Inc., A <br />607 NW Commodity Cove <br />Port St. Lucie, Florida 34986 <br />(772) 343-9787 FAX (772) 343-9404 <br />Terracon <br />Company . <br />Contact: David T Youngstrom <br />Contract Amount <br />Cer <br />1leted-te-Date <br />Remaining on Contract <br />Itemized Services <br />Qtyl Unit I Price I Amount <br />Qty Ameunt <br />Qty _ Afneunt <br />Qty <br />Ameunt <br />Qty Amount <br />Field Sampling and Testing <br />Sr Engineering Technician* <br />(includes In-place density testing) <br />Laboratory Testing** <br />Maximum Density ( T-180 [Proctor test]) <br />Full Sieve Analysis (T-27) <br />Limerock Bearing Ratio - LBR (FM -515) <br />• e - e • -- -: : ,• - . - . <br />Engineering & Reporting <br />Professional Engineer/Project Manager <br />240 <br />hour <br />$55 00 <br />$13,200 00 <br />0O0 <br />$0:00 <br />0 <br />$0:90 <br />0.00 <br />$009 <br />240 <br />$13,200 00 <br />28 <br />each <br />$86.00 <br />$2,408.00 <br />0 <br />$0.00 <br />0 <br />$0.99 <br />0 <br />$0.00 <br />28 <br />$2,408 00 <br />22 <br />each <br />$65 00 <br />$1,430 00 <br />0 <br />$0:00 <br />0 <br />$0:00 <br />0 <br />$0:00 <br />22 <br />$1,430 00 <br />10 <br />each <br />$300 00 <br />$3,000 00 <br />0 <br />$0:00 <br />0 <br />$0:90 <br />0 <br />$0.99 <br />10 <br />$3,000 00 <br />0 <br />hew <br />$6f <br />$0,00 <br />0-:00 <br />$0.00 <br />0 <br />$000 <br />000 <br />$0-09 <br />0 <br />$0:00 <br />:00 <br />50 <br />hour <br />$120 00 <br />$6,000.00 <br />0 <br />$000 <br />0 <br />$000 <br />0 <br />$0:00 <br />50 <br />$6,000 00 <br />* Perform sampling and testing, and construction observation of Roadway widening and FDR. <br />** The maximum density testing involves the laboratory density determination of the field -prepared <br />FDR mixture <br />with emulsions. <br />Estimated -Total <br />$26,038.00 1 <br />1 <br />1 <br />WOO f_ <br />1 <br />WOO I <br />$26,038.00 <br />Old Dixie Hwy FDR QA and Inspections Rev 8-29-14.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.