My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK: 2792 PG: 2059 <br />PUBLIC CONSTRUCTION BOND <br />Bond No. 48°135P <br />(enter bond. mber) <br />Timothy Rose Contr cting, <br />BY THIS B&OfDaemrri t Inc • , as Principal and Developers <br />Surety �nc _ Y , a corporation, as Surety, are bound to Indian River County <br />, herein called Owner, in the sum of $ 1, 792,422.35 , for payment of which we <br />bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and <br />severally. <br />THE CONDITION OF THIS BOND is that if Principal: <br />1, Performs the o tr ct dat d R r i�tw n Principal and Owner for <br />construction of > o� c l 7 ci <br />, the contract being <br />made a part of this bond by reference, at the times and in the manner prescribed in the <br />contract; and <br />2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida <br />Statutes, supplying Principal with labor, materials, or supplies, used directly or indirectly <br />by Principal In the prosecution of the work provided for in the contract; and <br />3. Pays Owner all losses, damages, expenses, costs, and attomey's fees, including <br />appellate proceedings, that Owner sustains because of a default by Principal under the <br />contract; end <br />4, Performs the guarantee of all work and materials furnished under the contract for the <br />time specified in the contract, then this bond is void; otherwise it remains in full force. <br />Any action instituted by a claimant under this bond for payment must be in accordance <br />with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. <br />Any changes in or under the contract documents and compliance or noncompliance <br />with any formalities connected with the contract or the changes does not affect Surety's <br />obligation under this bond. <br />DATED ON September, 17, 2014 <br />Timothy Rose Contracting, Inc. <br />imot y Rose - t, <br />Develops Surety, & Indemzfi'' y. Company <br />Robert Barra Atto:tttiej+".`•xt' > a- <br />00810. Public Construction Bond <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />
The URL can be used to link to this page
Your browser does not support the video tag.