My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER; <br />5. allow for partial utilization of the Work <br />by OWNER; <br />6. include testing and startup; and <br />7 be maintained in effect until final pay <br />•=greed to in <br />writing by OWNER, CONTRACTOR, and <br />ENGINEER with 30 days written notice to each <br />insurance has been issued. <br />B. OWNER shall purchase and maintain such <br />the interests of OWNER, CONTRACTOR, <br />Subcontractors, ENGINEER, ENGINEER's Consul <br />the Supplementary Conditions, each of whom is <br />C. All the policies of insurance (and the ccrtifi <br />rotes or othcr evidence thereof) required to be pur <br />written notice has been given to OWNER and CON <br />e _ee. <br />whom a certificate of insurance has been issued and <br />paragraph -54W, <br />D OWNER shall not be responsible for purchas- <br />ing and maintaining any property insurance specified <br />in this paragraph 5 06 to protect the interests of <br />CONTRACTOR, Subcontractors, or others in the <br />Work to the extent of any deductible amounts that are <br />identified in the Supplementary Conditions. The risk <br />of loss within such identified deductible amount will be <br />borne by CONTRACTOR, Subcontractors, or others <br />suffering any such loss, and if any of them wishes <br />property insurance coverage within the limits of such <br />amounts, each may purchase and maintain it at the <br />purchaser's own expense. <br />E. If CONTRACTOR requests in writing that <br />other special insurance be included in the property <br />insurance—policies provided under paragraph 5.06, <br />OWNER shall, if possible, include such insurance, <br />and the cost thereof will be charged to CONTRAC <br />TOR by appropriate Change- Order or Written <br />5.07 Waiver of Rights <br />A. OWNER and CONTRACTOR intend that all <br />will protect OWNER, CONTRACTOR, <br />Subcontractors, ENGINEER, ENGINEER's Consul <br />tants, and all other individuals or entities identified in <br />losses and damages caused by the perils er-sau..es,-ef <br />lose covered thereby. All such policies shall contain <br />any loss or damage the insurers will have no rights of <br />..e <br />waive all rights against each other and thei r <br />respective officers, directors, partners, employees, <br />perils or causes of loss covered by such policies and <br />and, in addition, waive all such rights against <br />Subcontractors, ENGINEER, ENGINEER's <br />Consultants, and all other individuals or entities <br />identified in the Supplementary Conditions to be listed <br />directors, partners, employees, agents, and other <br />them) under such policies for losses and damages so <br />mused. None of the above waivers shall extend to <br />trustee or otherwise payable under any policy so <br />is..ued. <br />B. OWNER waives all rights against <br />CONTRACTOR, Subcontractors, ENGINEER, <br />partners, employees, agents, and other consultants <br />1. loss due to business interruption, los., <br />of use, or other consequential loss extending <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 17 <br />F'\Public Works\ENGINEERING DIVISION PROJECTS \1137-0Id Dixie Hwy Resurfacing 53rd St to 71st St\Admim\bid documents Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.