Laserfiche WebLink
CLARIhICAT10NS / CORRECTIONS/QUESTIONS: <br />1. At the August 24, 2014 Pre-bid meeting, the County was requested to provide a detailed <br />Maintenance of Traffic (MOT) / Detour criteria. The Detour will be done in two phases which will <br />allow a Phase I road closure between the Indian River Farms Water Control District North Relief <br />Canal and 69th Street. Phase II will allow a road closure between 69th Street and 71st Street. <br />Attached is the Phase 1 and II MOT/Detour Criteria. <br />2. The road closures for each phase may be done in segments or in its entirety. Phase I and Phase II <br />may not be done at the same time. <br />3. Access to all businesses, residences, emergency vehicles and North County Charter School shall be <br />maintained at all times. <br />4. No traffic will be allowed on the new roadway between the time when the asphalt emulsion is <br />injected into the base material and the time when the first lift of asphalt is put down with the <br />exception of the local traffic for the businesses, residences and North County Charter School. <br />5. Through traffic for 65th Street and 69th Street shall be maintained at all times. <br />6. "Individual Business Name Service Signs" for all businesses and schools will be required per the <br />Manual of Uniform Traffic Control Devices 2009 Edition. The actual sign locations will be directed <br />by the Engineer. See the revised Itemized Bid Schedule, Sheets 00310-3, 4 & 5 of the contract <br />documents. <br />7. SECTION 102 — MAINTENANCE OF TRAFFIC of the Division 2, Technical Specifications of the <br />Contract Documents is hereby to include: <br />G. REVISIONS, ADDENDUM NO. 1 <br />Old Dixie Highway between IRFWCD North Relief Canal and 71St Street <br />Phase 1= Old Dixie Hwy between North Relief Canal and 69th Street <br />Phase 2 = Old Dixie Hwy between 69th Street and 71' Street <br />All projects and work within Indian River County right-of-way shall have an approved Traffic Control <br />Plan (TCP). All work shall be executed under the established TCP and Indian River County approved <br />procedures. The TCP shall provide the proposed detour route, traffic control devices, and other <br />pertinent information for the proposed Old Dixie Highway Resurfacing Project and shall be submitted <br />for review and approval by the Public Works Department. <br />The FDOT Design Standards, Indices 600, 2010 do not include a Traffic Control Plan for a full road <br />closure. For full road closures, a TCP is required to be submitted by the contractor a minimum of two <br />(2) weeks prior to the proposed road closure. <br />Page 2 of 5 <br />F\Public Works\ENGINEERING DIVISION PROJECTS \1137 -Old Dixie Hwy Resurfacing IRF North Relief Canal to 7Ist StWdmim\AddendumsWddendum No.1, 7-31-2014.doc <br />