My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLARIhICAT10NS / CORRECTIONS/QUESTIONS: <br />1. At the August 24, 2014 Pre-bid meeting, the County was requested to provide a detailed <br />Maintenance of Traffic (MOT) / Detour criteria. The Detour will be done in two phases which will <br />allow a Phase I road closure between the Indian River Farms Water Control District North Relief <br />Canal and 69th Street. Phase II will allow a road closure between 69th Street and 71st Street. <br />Attached is the Phase 1 and II MOT/Detour Criteria. <br />2. The road closures for each phase may be done in segments or in its entirety. Phase I and Phase II <br />may not be done at the same time. <br />3. Access to all businesses, residences, emergency vehicles and North County Charter School shall be <br />maintained at all times. <br />4. No traffic will be allowed on the new roadway between the time when the asphalt emulsion is <br />injected into the base material and the time when the first lift of asphalt is put down with the <br />exception of the local traffic for the businesses, residences and North County Charter School. <br />5. Through traffic for 65th Street and 69th Street shall be maintained at all times. <br />6. "Individual Business Name Service Signs" for all businesses and schools will be required per the <br />Manual of Uniform Traffic Control Devices 2009 Edition. The actual sign locations will be directed <br />by the Engineer. See the revised Itemized Bid Schedule, Sheets 00310-3, 4 & 5 of the contract <br />documents. <br />7. SECTION 102 — MAINTENANCE OF TRAFFIC of the Division 2, Technical Specifications of the <br />Contract Documents is hereby to include: <br />G. REVISIONS, ADDENDUM NO. 1 <br />Old Dixie Highway between IRFWCD North Relief Canal and 71St Street <br />Phase 1= Old Dixie Hwy between North Relief Canal and 69th Street <br />Phase 2 = Old Dixie Hwy between 69th Street and 71' Street <br />All projects and work within Indian River County right-of-way shall have an approved Traffic Control <br />Plan (TCP). All work shall be executed under the established TCP and Indian River County approved <br />procedures. The TCP shall provide the proposed detour route, traffic control devices, and other <br />pertinent information for the proposed Old Dixie Highway Resurfacing Project and shall be submitted <br />for review and approval by the Public Works Department. <br />The FDOT Design Standards, Indices 600, 2010 do not include a Traffic Control Plan for a full road <br />closure. For full road closures, a TCP is required to be submitted by the contractor a minimum of two <br />(2) weeks prior to the proposed road closure. <br />Page 2 of 5 <br />F\Public Works\ENGINEERING DIVISION PROJECTS \1137 -Old Dixie Hwy Resurfacing IRF North Relief Canal to 7Ist StWdmim\AddendumsWddendum No.1, 7-31-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.