My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Public Construction Bond shall be done and conform to Section 00610 — Public <br />Construction Bond <br />D. Trench Safety Compliance (Over 5') shall be done and comply to Section 00454 <br />— Sworn Statement under the Florida Trench Safety Act <br />E. Trench Safety Compliance (Shoring) shall be done and comply to Section 00454 <br />— Sworn Statement under the Florida Trench Safety Act <br />GENERAL <br />Maintain, prepare and provide the ENGINEER with record documents as specified below, <br />except where otherwise specified or modified within the scope of work provided in the <br />specific project contract documents. The Contractor and/or Developer shall be responsible <br />for, and required to provide, Record Drawings as outlined in this section. <br />MAINTENANCE OF RECORD DOCUMENTS: <br />1. Maintain in CONTRACTOR's field office in clean, dry, legible condition <br />complete sets of the following project documents: Drawings, Specifications, <br />Addenda, approved Shop Drawings, samples, photographs, Change Orders, <br />other modifications of Contract Documents, test records, survey data, Field <br />Orders, and all other documents pertinent to CONTRACTOR'S Work. <br />2. Provide files and racks for proper storage and easy access. <br />3. Make documents available at all times for inspection by ENGINEER and <br />OWNER. <br />4. Do not use record documents for any other purpose and do not remove them <br />from the field office. <br />5. Label each document "RECORD DRAWING" in 2 -inch high printed letters. <br />6. Keep record documents current at all times. <br />7. No work shall be permanently concealed until the required record data has <br />been obtained. <br />RECORD / AS -BUILT DRAWINGS <br />A. During the construction operation, the CONTRACTOR shall maintain records <br />of all deviations from the approved Project Plans and Specifications and shall <br />prepare therefrom "RECORD" drawings showing correctly and accurately all <br />changes and deviations from the work made during construction to reflect the work <br />as it was actually constructed. <br />B. The Record/As-Built survey shall be performed and subsequent plans <br />prepared by a Professional Surveyor and Mapper, registered in the state of <br />Florida and certified to the standards set forth in Chapter 472, Florida Statutes and <br />Chapter 5J-17.050 Florida Administrative Code (Florida Minimum Technical <br />Standards). <br />C. Field measurements of vertical or horizontal dimensions of constructed <br />improvements shall be obtained so that the constructed facility can be delineated in <br />01025-2 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1137-OId Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim\Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.