Laserfiche WebLink
7. Show invert elevation of sanitary service at property line. <br />8. Any and all necessary dedicated easement locations, identified by O.R. Book <br />and Page Number. <br />PUMP / LIFT STATION: <br />Record Drawings shall show elevations for the top and bottom and diameter of wet <br />well along with invert of effluent line. Record Drawings should also indicate the <br />make, model number, horsepower, impeller and condition point of pumps selected <br />and installed, shape of wet well, location of control panel, location of pump out <br />connection, float level settings, any deviation from the plans, and serial number(s) of <br />the pump(s). <br />SURVEY CONTROL <br />1. Install/re-establish: It shall be the contractor's responsibility to hire a <br />Professional Surveyor and Mapper as defined per Chapter 472, Florida <br />Statutes, to replace any horizontal and vertical control shown on the <br />engineering plans that was destroyed during construction. <br />2. New roadway alignment control points (survey baseline or controlling line and all <br />points as indicated on the plans or control sheet) upon final roadway completion. <br />Include all intersections and side streets. State plane coordinates and <br />elevations for all control points. <br />3. If shown on plans or not: Any Public Land Corner or Governmental Survey <br />Control point(s),vertical control (bench marks), property corners destroyed' <br />and/or disturbed during the scope of the project shall be properly re-established <br />as per standards as set forth within Florida Statutes, Administrative code and <br />Minimum Technical Standards for that type of survey. All said surveying <br />mentioned above shall be performed under the direct supervision of a <br />registered Professional Surveyor and Mapper in the state of Florida and <br />certified accordingly. Said Governmental agency(s) shall be notified in writing of <br />disturbance and re -establishments. <br />RECORD/AS-BUILTS DRAWINGS FORMAT - SUBMITTAL <br />A. ENGINEER will supply the CONTRACTOR with the electronic file of the <br />approved construction plans for the input of the As -Built (record) information. <br />B. CONTRACTOR shall deliver seven (7) certified sets of Record/As-Builts with <br />Electronic Drawing files prepared in AutoCAD 2009 AND PDF format or in <br />current version as agreed by the ENGINEER. <br />C. CONTRACTOR's surveyor shall review, sign and seal As-Builts or Record <br />drawing(s). Said drawing(s) shall clearly state type of survey, positional <br />tolerances, adhere and be certified to by a registered Professional Surveyor and <br />01025-5 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1137-0Id Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim'Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />