Laserfiche WebLink
the approved system, the OWNER or ENGINEER will shut the portion of the project <br />down that is not in compliance, and it shall remain shut -down until the pollution control <br />and treatment system is properly constructed or repaired, and complies with the <br />approved pollution control and treatment system plans and specifications. <br />C. Schedule construction to minimize erosion and stormwater runoff from the construction <br />site. Implement erosion control measures on disturbed areas as soon as practicable in <br />portions of the site where construction activities have temporarily or permanently <br />ceased, but in no case more than 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased. In addition to other temporary erosion <br />control measures that may be implemented, application of polyacrylamide is required <br />on all such disturbed areas within 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased, unless final landscaping has been <br />installed. Polyacrylamide application shall be as specified herein. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required by its <br />manufacturer or the OWNER, until the system is no longer needed. If a water quality <br />violation occurs, immediately cease all work contributing to the water quality violation <br />and correct the problem. <br />E. Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to the <br />Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR INSTALLATION, AND MAINTENANCE <br />A. State Certified Erosion Control Specialty Subcontractor is Required for Installation and <br />Maintenance: Installation and maintenance of all erosion and stormwater pollution <br />control devices, shall be by a State Certified erosion control subcontractor who <br />specializes in the installation and maintenance of such devices. After installation, this <br />specialty subcontractor shall maintain the erosion and stormwater pollution control <br />devices until in the ENGINEER's sole opinion, the devices are no longer necessary <br />(such time not to extend past the date the OWNER formally accepts the project as <br />01025-16 Technical Specifications <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1137-OId Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St'Admim'Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />