My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the approved system, the OWNER or ENGINEER will shut the portion of the project <br />down that is not in compliance, and it shall remain shut -down until the pollution control <br />and treatment system is properly constructed or repaired, and complies with the <br />approved pollution control and treatment system plans and specifications. <br />C. Schedule construction to minimize erosion and stormwater runoff from the construction <br />site. Implement erosion control measures on disturbed areas as soon as practicable in <br />portions of the site where construction activities have temporarily or permanently <br />ceased, but in no case more than 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased. In addition to other temporary erosion <br />control measures that may be implemented, application of polyacrylamide is required <br />on all such disturbed areas within 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased, unless final landscaping has been <br />installed. Polyacrylamide application shall be as specified herein. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required by its <br />manufacturer or the OWNER, until the system is no longer needed. If a water quality <br />violation occurs, immediately cease all work contributing to the water quality violation <br />and correct the problem. <br />E. Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to the <br />Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR INSTALLATION, AND MAINTENANCE <br />A. State Certified Erosion Control Specialty Subcontractor is Required for Installation and <br />Maintenance: Installation and maintenance of all erosion and stormwater pollution <br />control devices, shall be by a State Certified erosion control subcontractor who <br />specializes in the installation and maintenance of such devices. After installation, this <br />specialty subcontractor shall maintain the erosion and stormwater pollution control <br />devices until in the ENGINEER's sole opinion, the devices are no longer necessary <br />(such time not to extend past the date the OWNER formally accepts the project as <br />01025-16 Technical Specifications <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1137-OId Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St'Admim'Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.