My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
accidents, or the like, or when work has been resumed after being stopped by the <br />County because of unsatisfactory materials, equipment, or performance. Payment for <br />Mobilization shall be Lump Sum for the project. <br />b. Reclaimed Asphalt Base, in place and accepted, shall be paid for at the contract unit <br />price per square meter or square yard, as indicated in the Bid Sheet. The area of work <br />for the purpose of payment shall be the overall length of each reclaimed lane times the <br />specified total base width for the lane. The total base width shall include the widening <br />width, if any, in which the reclaimer is to be used to blend new base material with the <br />pulverized layers. Payment under this item shall be full compensation for all work <br />included in or incidental to the reclaiming operation, for the grading, shaping, and <br />compacting of the Reclaimed Asphalt Base, for the mix design study, for furnishing, <br />delivering, and applying water, for applying and mixing and furnishing asphalt emulsion <br />or other stabilizing agent as specified, and for all other work and material incidental to <br />the reclaiming operation. <br />Completed Base Course Testing — The Contractor shall perform a minimum of 8 tests <br />of the completed base course to verify that the completed base course meets the <br />specified minimum Structural Number of 1.8. Test locations shall be determined by the <br />County. In the event that the minimum Structural Number is not achieved, the County <br />may require corrective action, including the placement of additional asphalt structural <br />course at the expense of the Contractor. <br />c. Payment for Granular base material is included in the cost of the Reclaimed Asphalt <br />Base. The Contractor shall determine how much if any granular base is required and <br />shall include the cost for granular base in the cost of the Reclaimed asphalt base. <br />d. Asphalt Emulsion type CSS -1 h shall be uniformly incorporated in the layer at the <br />rate specified by the Mix Design. Payment is in gallons of Asphalt Emulsion Type CSS - <br />1h . <br />SS - <br />1h. <br />e. Manholes: Each manhole shall be protected during the reclamation process. After <br />final pass of reclaimer and final compaction, manholes shall be adjusted to the <br />appropriate height to accommodate the asphalt overlay finish grade. <br />f. Water Shutoffs: Water shutoffs and other valves or shutoffs shall be protected during <br />the reclamation process. After final pass of reclaimer and final compaction, water <br />shutoffs and other valves and shutoffs shall be adjusted to the appropriate height to <br />accommodate the asphalt overlay finish grade. <br />g. Material/Removal: Material shall be removed from the roadway area in order to <br />prepare for a desired final grade or removal of unsuitable material. Approximately 2- <br />1/2" removal shall be required off the top after initial pulverization. There is no <br />additional payment for removal of material. <br />Items of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 285-7 — Full Depth Reclamation Bituminous Asphalt — Per Square Yard <br />Bid Item No. 300-1 — Asphalt Emulsion type CSS -1 h, Based on 2.75 Gal/SY — Per <br />Gallon <br />01025-31 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1137-OId Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim\Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.