My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-129A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-129A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 2:54:08 PM
Creation date
1/10/2017 1:51:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/16/2014
Control Number
2014-129A
Agenda Item Number
8.E.
Entity Name
Timothy Rose
Subject
Contract and Specifications
Old Dixie Highway Resurfacing
Area
I.R.F.W.C.D. North Relief Canal to 71st. ST.
Project Number
1137
Bid Number
2014044
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 - PRODUCTS <br />2.01 DISINFECTION CHEMICALS <br />A. Chemicals: The disinfecting agent shall be sodium hypochlorite solution <br />ANSI/AWWA B303 or liquid chlorine ANSI/AWWA B301. Dry hypochlorite, <br />similar to "HTH" or equal may also be used as the disinfecting agent. <br />PART 3 - EXECUTION <br />3.01 EXAMINATION <br />A. Verify that piping systems have been cleaned, inspected, and tested. <br />B. Coordinate scheduling of flushing, pressure testing, and disinfection activities <br />with tie-ins, certifications, and sequence of construction. <br />3.02 FLUSHING AND PRESSURE TESTING - PIPING <br />A. The Contractor shall furnish and install suitable temporary testing plugs or caps for <br />the water lines, all necessary pressure pumps, hose, pipe connections, meters, <br />gauges and other similar equipment, and all labor required, all without additional <br />compensation -for conducting pressure and leakage tests and flushing of the <br />piping. Flushing and pressure testing shall be conducted in the following order. <br />B. After all piping lines have been installed and before pressure testing, each run of <br />pipe shall be thoroughly flushed so as to remove all debris and foreign matter <br />from the piping and equipment. Clean and flush all piping using potable water. <br />Sufficient flushing water and pigging shall be introduced into the piping to <br />produce a discharge that is clear with no evidence of silt or foreign matter is <br />visible. Contractor to provide means of discharging and disposing of water at <br />Contractor's expense. <br />C. Pressure testing ductile iron piping systems: <br />1. The test pressure for the water piping, irrigation quality water piping, and <br />force main piping systems constructed of ductile iron shall be 150 psi <br />and this pressure shall be maintained for a period of not less than two <br />hours. Tests shall be made between valves and as far as practicable <br />and as approved by the Engineer. Potable water from the distribution <br />system shall be used. Pressure shall not vary more than five (5) psi for <br />piping during the test periods or as approved by the Engineer. Allowable <br />leakage shall be computed on the basis of AWWA C-600. <br />2. All leaks evident at the surface shall be uncovered and repaired <br />regardless of the total leakage as indicated by the test, and all pipes, <br />valves and fittings and other materials found defective under the test <br />shall be removed and replaced at the Contractor's expense. Tests shall <br />be repeated until leakage has been reduced below the allowable <br />amount. <br />3. In the judgment of the Engineer, should it not be practical to follow the <br />foregoing procedures exactly for any reason, modifications in the <br />procedure shall be made as approved by the Engineer. In any event, the <br />Contractor shall be responsible for the ultimate water tightness of the <br />01025-39 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1137 -Old Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim'Addendums\Technical Specifications ADDENDUM 1 07-31-2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.