My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-003
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 4:52:15 PM
Creation date
1/10/2017 4:52:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/10/2017
Control Number
2017-003
Agenda Item Number
8.K.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
South Oslo Rd. Water Plant Floridan Well S-4 Replacement
Work Order No. 11
Area
Oslo Road water treatment plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> ESTIMATE FOR ENGINEERING SERVICES <br /> PROJECT:IRCU Floridan Well S-4 Replacement SHEET I OF 1 <br /> CLIENT:Indian River County Utilities FILE NO. <br /> ESTIMATOR:MDM DATE: 12/11/16 <br /> DESCRIPTION: DIRECT LABOR (MAN-HOURS) <br /> Floridan Well S-4 Replacement <br /> Design,permitting,Construction phase REG Dir Exp LINE <br /> SEN PROF DES/ EXP (4.6%) TOTAL <br /> PRINC PROF JL/FH P2(JPF) CLK SUB <br /> NO.I TASK <br /> 1 PREPARE DESIGN DOCS <br /> Review Well#S-4&siting I 4 2 2 $60 1,362 <br /> Prepare drawings&specs 4 20 88 6 $631 14,347 <br /> 100%review set 4 8 12 6 $181 4,117 <br /> Zentz Survey 2 4 $1,500 $48 2,598 <br /> C&W 2 4 $14,400 $48 15,498 <br /> JLA 2 4 2 $57 7,200 <br /> $45,122 <br /> 2 PERMITTING <br /> SJRWMD 4 4 $188 1,472 <br /> FDEP permit app&RAI 6 10 12 $163 3,715 <br /> JLA 1,890 <br /> $7,077 <br /> 3 Change Order Coordination <br /> Coordination with contractor 2 10 8 $125 2,843 <br /> Review change order 2 8 6 $88 2,314 <br /> C&W <br /> $5,157 <br /> 4 CONSTRUCTION PHASE <br /> Coordination/Observation 8 30 60 $493 14,103 <br /> Shop Dwgs 8 7 18 $196 4,459 <br /> Meetings 8 12 24, 24 $346 7,870 <br /> JLA onsite Drill#S-4 8 8 4 $139 30,988 <br /> JLA Well Completion Report $66 3,636 <br /> Startup&Operational testing(wellhead,FO) 10 8 30 $275 6,245 <br /> C&W $7,200 7,560 <br /> Final FDEP Release 6 20 $76 3,346 <br /> _ $78,207 <br /> TOTAL HOURS 84 58 189 202 $63,600 $3,181 135,563 $135,563 <br /> LABOR ($/HOUR) 235 225 150 105_ 96 <br /> SUBTOTAL $18,900 $8,700 $19,845 $19,392 $66,837 <br /> IRCU Well s4 Replacement rev3.xls 1/3/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.