My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-139
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 3:00:30 PM
Creation date
1/11/2017 1:48:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
09/23/2014
Control Number
2014-139
Agenda Item Number
8.C.
Entity Name
Duininck Inc.
Subject
Dunes Golf Course Irrigation System
Project Number
148060
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Form <br />T) A3 arti <br />/31 <br />No 1 <br />DATE OF ISSUANCE EFFECTIVE DATE <br />OWNER. Indian River County <br />CONTRACTOR Duininck, Inc. <br />Project. Dunes Golf Course Irrigation System Project <br />OWNER's Project No 148060 <br />You are directed to make the following changes in the Contract Documents <br />Description <br />Additional Part and Full Circle Sprinklers per Contract and Pump Station Zee Pipe <br />Connection <br />Reason for Change Order <br />The original design of the irrigation system had 993 valve -in -head sprinklers for the entire <br />property During installation, there are adjustments that need to be made in order to have <br />proper coverage of water These additional 23 heads, basically one per hole, will enhance <br />the golf course in certain areas where we didn't have water before In lieu of coming back <br />later and paying triple the price, it is best to install them now than later because of cost <br />The connection we were to use was an old metal corroded pipe and the pipe outlet was <br />reduced to a smaller size than what we were hqoking up to so it made sense to do this work <br />now rather than later and have a nice, clean connection with the correctly sized outlet. <br />The specification did not specify to connect to existing pump above or below ground We <br />are building a new Z so we will not have to rely on trying to connect to existing old and <br />corroded metal pipe <br />Much of the connection price is to change out an existing bottleneck reducer that was <br />installed when the new pump station was purchased years ago The existing pump header <br />is 10 inches in diameter and the Z pipe is 12 inches in diameter yet the pump goes from 10 <br />inch to 8 inch then 8 inch to 12 inch with a bottleneck in the middle We also need to <br />include a saddle on the new the pipe to accommodate their flow meter <br />This way the system is complete and new and HDPE all the way above ground and will <br />eliminate the very old existing bare metal pipe that is in the ground currently and below or in <br />the existing water table <br />Attachments (List documents supporting change) <br />Work Order Proposal from Duininck, Inc <br />Change Order - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.