Laserfiche WebLink
Page 2 I <br /> Subsurface Utility Engineering Services <br /> Designating Services <br /> Project Manager $115.00/per hour <br /> Senior Technician $85.00/per hour <br /> 2 man crew $185.00/per hour <br /> 3 man crew $205.00/per hour <br /> Vacuum Excavation <br /> Test Holes <br /> 1 Test Hole/Dirt $410.00 <br /> 1 Test Hole/Asphalt/Concrete $510.00 <br /> 2 - 19 Test Holes/Dirt $350 00/each <br /> 2- 19 Test Holes/Asphalt/Concrete $400.00/each <br /> 20-49 Test Holes/dirt $320.00/each <br /> 20-49 Test Holes/asphalt/concrete $360 00/each <br /> 50-99 Test Holes/dirt $275.00/each <br /> 50-99 Test Holes/asphalt/concrete $320.00/each <br /> 100 or more Test Holes/dirt $245.00/each <br /> 100 or more Test Holes/asphalt/concrete $280.00/each <br /> GPR Bore Route $500.00/each <br /> Vacuum Excavation for Environmental Services <br /> Vacuum Excavation for Monitoring Wells/Soil Samples when requirements dictate vacuum or hand digging down 8 feet to <br /> 10 feet prior to drilling.(3"-4" in diameter, 8'to 10'deep.concrete/asphalt removed if necessary) <br /> 1 -9 Monitoring Wells/Soil Samples $250.00/each <br /> 10- 19 Monitoring Wells/Soil Samples $200 00/each <br /> 20-49 Monitoring Wells/Soil Samples $150.00/each <br /> Utility Clearing- Using Ground Penetrating Radar $1 15.00/per hour <br /> as well as Conventional Electronic Line Locators <br /> An hourly rate of$285.00 will be used for all exploratory excavation projects. <br /> Larger excavation projects which require specialized equipment (shoring. de-watering, etc ) will be quoted on a task by <br /> task basis. <br /> Utility Coordination Services <br /> Senior Utility Coordinator $115.00/per hour <br /> Utility Coordinator $85.00/per hour <br /> CAD Technician $75.00/per hour <br /> Survey Services for Utility Projects <br /> Project Manager/Professional Surveyor and Mapper $115 00/Per hour <br /> Two Person Survey Field Team $115.00/per hour <br /> Three Person Survey Field Team $145 00/per hour <br /> Clerical $50.00/per hour <br /> Concrete Radar Mappinglimaging <br /> (concrete assessment/inspection,grid scans,density&debris assessment) <br /> 1 Man Crew $115.00/per hour <br /> Closed Circuit Televising (CCTV) Services $1 15.00/per hour <br /> Maintenance of Traffic (MOT) <br /> if required MOT specialist will be contracted and cost for same will be passed on with a 10% mark-up for coordination of <br /> same <br /> SSMC MOT Lane Closures Per Lane Closure $350 00/per day <br /> Per Lane Closure $500.00/per night <br /> Gary B Krick, PSM/ President Date:_Xlut� �?�l <br />