My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-151A
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-151A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 3:56:19 PM
Creation date
1/12/2017 12:00:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/07/2014
Control Number
2014-151A
Agenda Item Number
8.D.
Entity Name
Melvin Bush Construction
Subject
Contract and Specifications
69th Street Bridge
Area
69th St. Bridge over I.R.F.W.C.D. Lateral G Canal
Project Number
1363
Bid Number
2014045
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.07 Patent Fees and Royalties 22 <br />6 08 Permits. . 22 <br />6 09 Laws and Regulations ................... .................22 <br />6.10 Taxes.... 22 <br />6 11 Use of Site and Other Areas 22 <br />6.12 Record Documents .. ................ .. .23 <br />6.13 Safety and Protection .23 <br />6.14 Safety Representative.. ..24 <br />6.15 Hazard Communication Programs .24 <br />6.16 Emergencies. .24 <br />6.17 Shop Drawings and Samples........... .24 <br />6.18 Continuing the Work ..25 <br />6.19 CONTRACTOR's General Warranty and Guarantee . ..25 <br />6.20 Indemnification .......26 <br />ARTICLE 7 - OTHER WORK ............ ..26 <br />7.01 Related Work at Site .26 <br />7 02 Coordination . .27 <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES ... . ..27 <br />8 01 Communications to Contractor .27 <br />8 02 Replacement of ENGINEER .27 <br />8 03 Furnish Data ........... ..27 <br />8.04 Pay Promptly When Due .27 <br />8.05 Lands and Easements; Reports and Tests ...27 <br />8.06 Insurance ....28 <br />8.07 Change Orders .. 28 <br />8 08 Inspections, Tests, and Approvals .. <br />8 09 Limitations on OWNER's Responsibilities ... <br />8 10 Undisclosed Hazardous Environmental Condition <br />8 11 Evidence of Financial Arrangements.......... .. <br />28 <br />28 <br />28 <br />28 <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION 28 <br />9.01 OWNER'S Representative 28 <br />9.02 Visits to Site 28 <br />9.03 Project Representative ..28 <br />9.04 Clarifications and Interpretations . 29 <br />9.05 Authorized Variations in Work . 29 <br />9.06 Rejecting Defective Work.... 29 <br />9 07 Shop Drawings, Change Orders and Payments 29 <br />9 08 Determination for Unit Price Work ....... 29 <br />9.09 Decisions on Requirements of Contract Documents and Acceptability of Work 29 <br />9.10 Limitations on ENGINEER's Authority and Responsibilities 30 <br />ARTICLE 10 - CHANGES IN THE WORK, CLAIMS 30 <br />10.01 Authorized Changes in the Work 30 <br />10.02 Unauthorized Changes in the Work 30 <br />10 03 Execution of Change Orders 30 <br />10.04 Notification to Surety ... .31 <br />10.05 Claims and Disputes 31 <br />00700 - General Conditions REV 5-10-13 <br />00700 - 3 <br />F\Public Works\ENGINEERING DIVISION PROJECTS\1363-69th St Bridge @ Lat G Canal -Culvert Install\Admin\bid documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.