Laserfiche WebLink
ADDENDUM #1 9-5-2014 <br />Bid Item 430 175 160 Concrete Pipe Culvert (72") Per Linear Foot <br />• <br />fl <br />Bid Item 430-175-160 — Concrete Pipe Culvert (60") — Per Linear Foot <br />Bid Item 430-175-196 — Concrete Pipe Culvert (Class 111 — 96") — Per Linear Foot <br />SECTION - 530 — RIPRAP <br />The work specified in this item shall conform to Section 530 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2014). <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item 530-3-4 — Rock — Riprap Rubble <br />SECTION - 570 — PERFORMANCE TURF <br />The work specified in this item shall conform to Section 570 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2014). <br />A. Description: Sod for the project shall be of the variety that is common to the area and <br />of a variety approved by the Engineer. This work shall also include mowing, to be <br />mowed at maximum 6" height with a mulching mower. <br />B. Work Included: Scope of Work: The work specified in this section consists of the <br />establishing of a stand of grass, within the project, right-of-way, easements, and other <br />areas indicated on the Drawings, by furnishing and placing grass sod. Also included <br />are fertilizing, watering and maintenance as required to assure a healthy stand of <br />grass. Two applications of fertilizer will be required with the initial application being <br />fertilizer and the second application being "weed and feed". <br />C. Guarantee: All sodded areas shall be guaranteed for one year after date of final <br />acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a <br />square) indication of probable non survival or lack of health and vigor, or which do not <br />exhibit the characteristics to meet specifications, shall be replaced within two weeks of <br />notice from Owner or Engineer. All replacement sod shall be furnished/installed at no <br />additional cost to the Owner and shall be guaranteed for three months. All replacement <br />shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth shall <br />be replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the Indian River County Fertilizer <br />01025-27 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1363-69th St Bridge @ Lat G Canal -Culvert Install\Admin\Addendum\Hdden #1 <br />Technical Specifications.doc <br />