My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-155
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 2:01:11 PM
Creation date
1/12/2017 2:01:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/21/2014
Control Number
2014-155
Agenda Item Number
12.G.1
Entity Name
Masteller & Moler
Subject
North Sebastian Sewer Design Phase 1 Commercial
Work Order No.7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 25, 2014 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> "EXHIBIT 1" <br /> WORK ORDER NO.7 <br /> (Time Schedule) <br /> Time of Performance <br /> The estimated time frame for completion of services from the approval of this Work Order <br /> is as follows: <br /> MILESTONE COMPLETION DATE <br /> Tasks A, B, and C 120 Calendar Days after Notice To Proceed <br /> Note: <br /> The time for completion of the 60% design drawings, permit applications and Engineer's <br /> Opinion of Probable Construction Cost for the project shall be three (3) months from notice <br /> to proceed. Once permits are received, 100% design drawings shall be completed in thirty <br /> (30) calendar days thereafter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.