My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-160
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 4:02:05 PM
Creation date
1/13/2017 10:00:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/04/2014
Control Number
2014-160
Agenda Item Number
8.O.
Entity Name
Florida Department of Environmental Protection
Subject
Wabasso Beach Restoration Project
Grant Agreement
Area
Wabasso Beach
Project Number
14IR3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 2013 Physical Monitoring <br />Permit required physical monitoring was conducted in accordance with the terms and conditions of DEP permit <br />number 0285993-001-7C. The post construction physical monitoring efforts included data acquisition and quality <br />control, survey data analysis and the preparation of a physical monitoring report. <br />Deliverable A: 2013 Physical monitoring report. <br />Total Cost: $40,473.36 (DEP cost $20,236.68). <br />Due Date: January 30, 2017. <br />Deliverable B: 2013 Survey data in DEP format. <br />Total Cost: $17,050 (DEP cost $8,525). <br />Due Date: January 30, 2017. <br />4.3 2013 Hardbottom Monitoring <br />Permit required hardbottom monitoring was conducted in accordance with the terms and conditions of DEP <br />permit number 0285993 -001 -JC. The post construction hardbottom monitoring efforts included transect <br />monitoring surveys of 23 previously established permanent cross-shorc transccts from R20 through R65. The <br />field surveys also consisted of the mapping of nearshore edge of hardbottom along the length of the project. <br />Hardbottom monitoring also included a post -construction UMAM analysis of hardbottom impacts. <br />Deliverable A: 2013 Hardbottom monitoring report and UMAM analysis report. <br />Total Cost: $241,962.42 (DEP cost $120,981.21). <br />Due Date: January 30, 2017. <br />NOTE: The deliverable due dates established in this Grant Work Plan indicate the time by which a <br />deliverable is received and approved for cost sharing. The dates do not necessarily correspond with permit <br />required due dates. The Local Sponsor must meet the terms of the permit for compliance. <br />All Tasks are Contractual Services. <br />DEP Agreement No. 14183, Attachment A, Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.