Laserfiche WebLink
SCS ENGINEERS <br />FEE SCHEDULE (Continued) <br />(Effective October 1, 2014 through November 16, 2017) <br />Page 2 i <br />SCS ENGINEERS <br />REIMBURSABLES FEE SCHEDULE <br />(Effective October 1, 2014 through November 16, 2017) <br />ADMINISTRATION/MILEAGE <br />Unit Cost <br />(S) <br />Unit <br />Reimbursable <br />Vehicle Mileage 0.56 mile <br />Truck Usage $75 day <br />Reproduction — Black and White Copies 0.10 each <br />Reproduction - Color Copies 0.75 each <br />CAD Usage 5 hour <br />EQUIPMENT/FIELD SUPPLIES <br />Sampling Trailer, Field Equipped <br />Rate ($) <br />250 <br />Unit <br />Day <br />Field -equipped sampling trailer includes equipment and supplies for soil and groundwater <br />sampling, decontamination, health and safety, logs, packing and shipping, and <br />miscellaneous uses. <br />Calibration: <br />Conductivity Standards * 1 Ounce <br />Isobutylene * 1 Liter <br />Methane in Air OVA Calibration Gas * 1 Liter <br />Pentane in Air * 1 Liter <br />pH Buffer Solutions (4,7,10) * 1 Ounce <br />Decontamination Equipment: <br />Brushes * 5 Day <br />Distilled/Deionized Water * 1 Gallon <br />Isopropyl Alcohol * 1 Ounce <br />Liquinox Soap Concentrate * 1 Ounce <br />Plastic Buckets * 5 Day <br />