IRRIGATION GENERAL NOTES <br />A. EXTENT <br />IRRIGATION SYSTEM LIMITS GENERALLY INCLUDE THE MEDIAN AREA AND EDGES OF RIGHT OF WAY FROM 21st ST SE TO HIGHLAND DRIVE SE. THE IRRIGATION <br />SYSTEM WILL UTILIZE AN IRRIGATION WELL FOR THE WATER SOURCE AND PUMP STATION WITH ELECTRIC CONTROLLER AND RAIN SENSOR PROVIDE <br />ELECTRIC SERVICE TO POWER THE PUMP STATION. THE IRRIGATION WORK INCLUDES FURNISHING ALL LABOR, MATERIALS AND EQUIPMENT FOR THE <br />INSTALLATION OF THE IRRIGATION SYSTEM. <br />THE PROJECT SCOPE INCLUDES THE PROVISIONS SHOWN IN THE PLANS AND THE PAYMENT OF REQUIRED FEES TO GOVERNMENTAL AGENCIES HAVING <br />JURISDICTION OVER THE WORK, OBTAINING REQUIRED PERMITS AND COORDINATING REQUIRED INSPECTIONS. THE SCOPE DOES NOT INCLUDE PAYING <br />ELECTRIC BILLS RELATED TO THE IRRIGATION SYSTEM. <br />GENERAL NOTES <br />1 VERIFY CONDITIONS AND DIMENSIONS SHOWN ON THE PLANS AT THE SITE PRIOR TO COMMENCEMENT OF WORK UNDER THIS CONTRACT <br />2. REFER TO THE LANDSCAPE PLAN WHEN TRENCHING TO AVOID EXISTING AND PROPOSED TREES. LAYOUT MAIN LINES, VALVES AND LATERAL LINES AND <br />STAKE SPRINKLER HEAD LOCATIONS TO ENSURE PROPER COVERAGE AND ADJUST AS NECESSARY TO AVOID INTERFERENCES WITH EXISTING OR PROPOSED <br />SITE OBSTRUCTIONS AND LIMITATIONS PRIOR TO BEGINNING IRRIGATION INSTALLATION. <br />3. MAKE ADJUSTMENTS TO THE IRRIGATION SYSTEM TO ENSURE MINIMAL OVERLAP AND TO MINIMIZE OVERSPRAY SUBSTITUTE ADJUSTABLE <br />NOZZLES FOR FIXED PATTERN NOZZLES SPECIFIED WHERE NECESSARY <br />4. RUN 2 ADDITIONAL SETS OF SPARE WIRES IN EACH DIRECTION TO EACH END OF THE MAIN FOR FUTURE USE. <br />5. THE SCOPE OF WORK INCLUDES HARD WIRING ELECTRICAL SERVICE CONNECTIONS. <br />6. SLEEVES BELOW ROADWAY AND SIDEWALK PAVEMENT MUST BE SCH. 40. COORDINATE WITH THE ROADWAY CONTRACTOR TO ENSURE THAT SLEEVES <br />ARE INSTALLED PRIOR TO RESURFACING OF ROAD AND CONSTRUCTION OF CURBS AND SIDEWALKS. <br />7 MAIN LINE SLEEVE LOCATIONS BELOW ROADWAY PAVEMENT ARE ACCOMPANIED WITH A 2' ELECTRICAL SLEEVE FOR THE LOW VOLTAGE <br />CONTROL WIRING, (ALSO PROVIDED & INSTALLED BY THE CONTRACTOR). <br />8. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE TO CONTACT THE ENGINEER FOR HYDROSTATIC AND OPERATIONAL TESTING <br />9. MAIN LINE PIPES PLACED IN SLEEVES WILL BE SCH. 40 SOLVENT WELD WITH ADEQUATE RESTRAINTS. THE SLEEVE MUST BE A MINIMUM <br />TWO TIMES LARGER THAN THE ENCASED PIPE DIAMETER. <br />10 COMPONENTS SHOWN AND/OR DEPICTED ON THE PLAN SHEETS REPRESENT APPROXIMATE LOCATION ONLY, AND ARE FOR CLARIFICATION <br />PURPOSES. DO NOT SCALE PLAN FOR EXACT HEAD LOCATION. THE FINAL LOCATION OF COMPONENTS WILL BE SUBJECT TO APPROVAL BY THE ENGINEER. <br />11 PIPING ON THE PLANS IS DIAGRAMMATICALLY ROUTED FOR CLARITY AND WILL BE ROUTED TO AVOID PLANTS AND UTILITIES. TAKE PRECAUTIONS <br />TO MINIMIZE DAMAGE TO EXISTING TREE ROOTS TO THE EXTENT POSSIBLE. DESIGN MODIFICATIONS WILL ONLY BE MADE AS NECESSARY TO MEET <br />FIELD CONDITIONS AND ONLY UPON APPROVAL OF THE ENGINEER. <br />11. IN SOME LOCATIONS ON THE IRRIGATION PLANS, THE MAIN LINE 15 SHOWN IN THE ROADWAY FOR CLARITY THESE MAIN LINES WILL BE LOCATED <br />12" FROM BACK OF CURB AND WITHIN THE MEDIAN WHEN POSSIBLE. <br />13 IRRIGATION COMPONENT TRADE NAMES ARE SPECIFIED DUE TO REQUEST BY MAINTAINING AUTHORITY (INDIAN RIVER COUNTY), TO ENSURE COMPATIBILITY <br />WITH OTHER COUNTY SYSTEMS. SUBSTITUTIONS TO MATERIALS SPECIFIED MUST BE APPROVED BY THE ENGINEER AND THE MAINTAINING AUTHORITY <br />14. TEST IRRIGATION WATER AFTER WELL I5 CONSTRUCTED TO ENSURE /T IS SUITABLE FOR LANDSCAPE IRRIGATION. IF THE IRON CONTENT EXCEEDS <br />7.2 PARTS PER MILLION, PROVIDE A RUST INHIBITOR SYSTEM TO ENSURE THAT ROADWAY PAVEMENT AND OTHER STRUCTURES ARE NOT STAINED. <br />15. CONSULT WITH WELL DRILLER TO ENSURE SUCTION LIFT LEVELS WILL BE SUITABLE FOR THE CENTRIFUGAL PUMP AS SPECIFIED. <br />16. A5 PART OF THIS FDOT CONSTRUCTION PROJECT, ANY PRIVATELY OWNED IRRIGATION SYSTEMS FOUND INSIDE FDOT R/W WILL BE CAPPED WHERE THE SYSTEM I5 <br />IMPACTED BY THE PROJECT CONSTRUCTION LIMITS AND AS DIRECTED BY THE ENGINEER. NOTIFY THE ADJACENT PROPERTY OWNERS WHERE THE IRRIGATION SYSTEMS <br />ARE FOUND TO ENSURE ALL SALVAGEABLE MATERIAL CAN BE RETRIEVED BY THE PROPERTY OWNER PRIOR TO CONSTRUCTION. PROVIDE THE PROPERTY OWNER WITH A <br />MINIMUM OF 2 WEEKS ADVANCE NOTICE IN AREAS WHERE EXISTING IRRIGATION SYSTEMS WILL BE IMPACTED. THE PROPERTY OWNER WILL BE RESPONSIBLE FOR REPAIRING, <br />CONSTRUCTING OR REPLACING ANY IRRIGATION SYSTEMS FOUND WITHIN FDOT R/W WHICH ARE CAPPED OR DAMAGED DURING THE CONSTRUCTION OPERATIONS. <br />17 CONSTRUCT THE NEW SYSTEM AS SHOWN /N THE PLANS AND REPAIR ALL DAMAGE CAUSED BY THE PERFORMANCE OF WORK AND ALL WORK PERFORMED BY SUB <br />CONTRACTORS. REPAIR, REPLACE OR RESTORE UTILITIES THAT ARE DISRUPTED DUE TO WORK OPERATIONS THE CONTRACTOR WILL BE RESPONSIBLE FOR THE <br />OPERATION AND MAINTENANCE OF THE SYSTEM DURING CONSTRUCTION AND THROUGHOUT THE ONE YEAR WARRANTY PERIOD. <br />18 IRRIGATION PLANS DO NOT COVER THE ENTIRE PROJECT LIMITS. ONLY AREAS TO RECEIVE IMPROVEMENTS ARE SHOWN. <br />19. ABOVE AND BELOW GROUND UTILITIES WILL BE VERIFIED AND LOCATED PRIOR TO COMMENCING WORK IN THE PROJECT AREA BY CALLING SUNSHINE ONE <br />CALL OF FLORIDA, AT 811 TWO WORKING DAYS PRIOR TO DIGGING. REFER TO THE ROADV/AY GENERAL NOTES SHEET FOR A LIST OF KNOWN UTILITY <br />PROVIDERS IN THE AREA. <br />REVISIONS <br />DATE <br />DESCRIPTION <br />DATE <br />DESCRIPTION <br />Landscape Architect Of Record' Robert) Cotleur ALA- 11067 <br />Cotleur & Hearing, Inc. <br />1934 Commerce Lane Suite 1 <br />Jupiter Florida 33458 <br />567-747-6336 Fax 561-747-1377 <br />Cert of Auth. LC -C000239 <br />STATE OF FLORIDA <br />DEPARTMENT OF TRANSPORTATION <br />ROAD NO. <br />COUNTY <br />FINANCIAL PROJECT 1D <br />INDIAN RIVER <br />228583-2-52-01 <br />IRRIGATION GENERAL NOTES <br />SHEET <br />NO <br />LD -13 <br />hohxsod <br />7/11/2014 <br />4 45 36 PM <br />F\PROJECTS-P00r\226583-3 US1 DB IRC\Ion(srp\660r0002 dgn <br />