My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-201
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 12:13:21 PM
Creation date
1/19/2017 1:47:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/16/2014
Control Number
2014-201
Agenda Item Number
8.F.
Entity Name
Summerlin's Marine Construction
Subject
Grand Harbor Marina Boat Club Island Dock
Removal and Repair
Area
Boat Club Island
Project Number
2014040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/Z'/�/y A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />6F J.R. SMITH, CLERK <br />/Are-riAGLErrevki of Lranlq'- AO l <br />ae e 71-0 ejvi/zottifrfrA4c Contractor Agreement <br />THIS AGREEMENT is by aid between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Summerlin's <br />Marine Construction, LLC (hereinafter called CONTRACTOR). <br />OWNER and FONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: _ <br />Removal of southernmost dock and repair of middle dock at Boat Club Island (Spoil Island IR -25) <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: Removal/Repair of Docks at Boat Club Island (Spoil Island IR -25) <br />RFP Number: 2014040 <br />Project Location: +1/2 mile NE of Grand Harbor Marina in IRL, Vero Beach, FL <br />ARTICLE 3 — TERM AND CONTRACT TIMES <br />3.01 Term: This Agreement shall remain in effect for a term of one (1) year, unless otherwise sooner <br />terminated by mutual consent of the parties. <br />3.02 Time of Completion: Project shall be completed, to include approval by the Building Division 30 <br />days from receipt of the Notice to Proceed. <br />ARTICLE 4 - CONTRACT PRICE <br />4.01 OWNER shall pay CONTRACTOR for completion of the Work an amount in current funds equal to <br />the sum of the amounts determined pursuant to paragraph 4.01.A and summarized in paragraph 4.01.B, <br />below: <br />A. For all Work, at the prices stated in CONTRACTOR's Proposal, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract Documents: <br />Numerical Amount: $18,650.00. <br />Written Amount: Eighteen thousand six hundred and fifty dollars and 00/100. <br />Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.