My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-201
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 12:13:21 PM
Creation date
1/19/2017 1:47:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/16/2014
Control Number
2014-201
Agenda Item Number
8.F.
Entity Name
Summerlin's Marine Construction
Subject
Grand Harbor Marina Boat Club Island Dock
Removal and Repair
Area
Boat Club Island
Project Number
2014040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />:;ERTIFICATIQN ON LAST PAGE <br />I R SMITH, CLERK <br />6.05 The insurance policies procured shall be occurrence forms, not claims made policies with the <br />exception of professional liability. <br />6.06 A certificate of insurance shall be provided to the COUNTY's Risk Manager for review and <br />approval, ten (10) days prior to commencement of any work under this Agreement. The COUNTY shall <br />be named as an additional insured on all policies except workers' compensation and professional <br />liability. <br />6.07 The insurance companies selected'shall send written verification to the COUNTY's Risk Manager <br />that they will provide 30 days prior written notice to the COUNTY's Risk Manager of its intent to cancel <br />or modify any required policies of insurance. <br />6.08 CONTRACTOR shall include all Subcontractors as insured under its policies or shall furnish <br />separate certificates and endorsements for each Subcontractor. All coverages for Subcontractors shall <br />be subject to all of the requirements stated herein. <br />6.09 The COUNTY, by and through its Risk Manager, reserves the right periodically to review any and <br />all policies of insurance and to reasonably adjust the limits of coverage required hereunder, from time <br />to time throughout the term of this Agreement. In such event, the COUNTY shall provide the <br />CONTRACTOR with separate written notice of such adjusted limits and CONTRACTOR shall comply within <br />thirty (30) days of receipt thereof. The failure by CONTRACTOR to provide such additional coverage shall <br />constitute a default by CONTRACTOR and shall be grounds for termination of this Agreement by the <br />COUNTY. , <br />6.10 The CONTRACTOR shall indemnify and hold harmless the COUNTY, and its officers and <br />employees, from liabilities, damages, losses, and costs, including, but not limited to, reasonable <br />attorneys' fees, arising out of or related to the negligence, recklessness, or intentionally wrongful <br />conduct of the CONTRACTOR and other persons employed or utilized by the CONTRACTOR in the <br />performance of this Agreement. <br />ARTICLE 7 - CONTRACTOR'S REPRESENTATIONS <br />7.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related <br />data identified in the Request for Proposal documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, <br />and Site conditions that may affect cost, progress, and performance of the Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations <br />that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, investigations, explorations, tests, studies, and data <br />concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect cost, progress, or performance of the Work or which relate to any aspect of the <br />means, methods, techniques, sequences, and procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.