Laserfiche WebLink
Assumptions <br />CAI represents to the CLIENT that in developing this Scope of Work, assumptions have been <br />made, and that deviation from assumptions identified within this proposal may require additional <br />expenditures on behalf of the CLIENT to CAI. Assumptions, not already mentioned herein, are <br />as follows: <br />1. Engineering proposal is based upon no request for zoning change, land use change, planned <br />development exceptions, or variances. <br />2. This proposal specifically excludes all application and/or impact fees, which shall be the <br />responsibility of the OWNER <br />3. It is assumed that site plan approval will not be required from the City of Vero Beach since <br />there is no new impervious area proposed with the plan. <br />4. Construction staking and as -built surveys are not included with this proposal. <br />General <br />CAI will generally bill the CLIENT monthly on approximately the 10a` day of each month for the <br />previous month's charges. All tasks will be billed on a percentage complete/lump sum basis, plus <br />direct expenses (See attached Rate Schedule). Should additional services be required, a separate <br />written agreement will be prepared and fees shall be negotiated based on the attached Rate <br />Schedule. <br />Should you have any questions regarding our proposal scope of work or terms of agreement, <br />please feel free to call me. If you would like us to proceed with the work described herein, please <br />sign below and return an original signed copy which will serve as our notice to proceed. <br />Sincerely, Agreed to and Accepted:: <br />TER ASSOCIATES, INC. By: <br />kr-\- , Print Name: <br />John H. Blum, P.E. Address: <br />Principal <br />KIHRIPROPOSALIBertli-FireSlationtdoc Page 2 of 3 <br />02014 by CAI <br />servfr g 14oricki <br />Since 01 <br />