My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-015
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 10:54:20 AM
Creation date
1/26/2017 10:54:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
01/24/2017
Control Number
2017-015
Agenda Item Number
15B.2
Entity Name
Geosyntec Consultants
Subject
South Gifford Road Landfill
Amendment No.2 to Work Order No.4
Area
South Gifford Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br /> BUDGET ESTIMATE <br /> SOUTH GIFFORD ROAD LANDFILL <br /> PHASE 3:Injection Activities <br /> ITEM BASIS RATE, QUANTITY ESTIMATED <br /> BUDGET <br /> A. Professional Services '�:I <br /> a.Principal hr $221 2 $442 <br /> c.Senior Project Geologist hr $184 4 $736 <br /> d.Project Engineer hr $143 12 $1,716 <br /> e.Staff Engineer hr $93 60 $5,580 <br /> Subtotal Professional Services $8,474 <br /> B. Technical/AdministrativeServices st <br /> a. Site Manager/Construction Manager hr $105 60 $6,300 <br /> Subtotal Technical/Administrative Services $6,300 <br /> x. <br /> C. Subcontractors �:,:'.....+,,' <br /> a.Driller Mod/demob/prep LS $428.00 1 1 $428 <br /> b.DPT Daily Rate day $1,444.50 3 $4,334 <br /> c.Per Diem,per night day $214.00 2 $428 <br /> d.Injection Pump Rental day $214.00 3 $642 <br /> e.Monitoring Well Installation each $323 14 1 $323 <br /> f.Decon LS $267.50 1 $268 <br /> g.Permits LS $53.50 1 $54 <br /> h.Drums each $53.50 1 $54 <br /> i.GPS Unit/Level/Rod for Surveying day $6300 1 $63 <br /> Subtotal Subcontractor Services $6,592 <br /> D. Reimbursables <br /> a.Lodging day $89 4 $356 <br /> b.Per Diem day $51 5 $255 <br /> c.Communications Fee 3%labor 003 $14,774 1 $443 <br /> d.CADD Computer System br $15 0 $0 <br /> e.Vehicle Rental day $75 4 $300 <br /> f. SRS Delivery LS $1,169.51 1 $1,170 <br /> g. SRS Purchase drum $858.68 10 $8,587 <br /> h. SRS Injection Trailer/Injection Manifold week $700.00 1 $700 <br /> i. Tank Rental Delivery/Pickup LS $1,471.25 1 $1,471 <br /> j. Tank Rental day $5564 5 $278 <br /> k. Tank Cleaning Fee LS $802.50 1 $803 <br /> 1. KB-I Plus(with delivery) LS $4,682.00 1 $4,682 <br /> m. Hydrant hookup and water usage LS $200.00 1 $200 <br /> n. Dedicated Miscellaneous Injection Supplies LS $250 1 $250 <br /> o. O&M Kit day 1 $65 4 $260 <br /> p. Well Installation Kit day $150.00 1 $150 <br /> q. Equipment Shipping each $54 2 $108 <br /> Subtotal Reimbursables $20,012 <br /> TOTAL ESTIMATED BUDGET:PHASE 3 $41,379 <br /> Notes: <br /> 1 Lodging and per diem rates were taken from the GSA website for the Vero Beach area(www.gsa.gov). <br /> 2. O&M Kit includes various small iterms for minor work/repairs(valves,PVC fittings,gaskets,etc.). <br /> 3 Well Installation Kit includes:water level indicator,PID/FID OVA,GPS unit,field geology kit,measuring <br /> wheel,multi-meter(pH,temperature,conductivity,turbidity,dissolved oxygen,and oxidation reduction <br /> potential),and miscellaneous supplies. <br /> XR16044.xtsx Ge synlm Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.