Mr. Himanshu H. Mehta, P.E. <br /> 28 December 2016 <br /> Page 3 <br /> Phase 2—Meetings/Regulatory Interaction <br /> Under this task, Geosyntec will prepare for, and attend a project meeting with FDEP, as requested <br /> by IRC SWDD. It has been assumed that two Geosyntec personnel will attend the meeting, which <br /> will be held at the IRC SWDD office. A powerpoint presentation will be prepared for use during <br /> the meeting. <br /> Phase 3—Iniection Activities <br /> Under this task, Geosyntec will implement the proposed injection activities, as outlined in the <br /> FDEP-approved RAPM Addendum No. 3 and detailed information provided to IRC SWDD via <br /> email on 28 December 2016 regarding the proposed injection approach and refined treatment area. <br /> These activities will include monitoring well installation,procurement of injection amendment and <br /> drilling subcontractor and performance of the injection activities. It has been assumed that the <br /> injection activities can be completed in five field days(one day for onsite field prep,three days for <br /> monitoring well installation and injection activities, and one day for breakdown). IDW will be <br /> containerized and staged on-site for proper disposal. <br /> Underground Injection Control (UIC) monitoring is required after injecting remedial fluids into <br /> the aquifer according to Chapter 62-528 of the Florida Administrative Code (F.A.C.). UIC <br /> monitoring will be included with the semi-annual sampling events until criteria are met. <br /> Performance monitoring of CVOCs and total organic carbon will continue to be included as part <br /> of the semi-annual sampling events. Budget for UIC and performance monitoring will be <br /> conducted concurrently with semi-annual groundwater monitoring at the Site as a cost-savings <br /> measure. Budget has not been included herein for these activities at this time. <br /> Phase 4—Reporting <br /> Implementation of RAPM Addendum No. 3 will be summarized in the semi-annual groundwater <br /> monitoring report that follows completion of the implementation activities. A limited budget has <br /> been included herein to incorporate a description of these activities and a summary of the results <br /> into the currently authorized semi-annual groundwater monitoring reports. <br /> SCHEDULE <br /> Geosyntec will initiate project scheduling and implementation activities within two weeks of <br /> receipt of notice to proceed from the County. The final field schedule will be based on <br /> subcontractor availability and the delivery schedule for the injection materials. We anticipate that <br /> the field activities will tentatively be conducted in February 2017. A description of the well <br /> installation and dosing activities will be included in future semi-annual groundwater monitoring <br /> report(s). <br /> XR16044-Gifford RAPM3 Imp <br /> engineers I scientists I innovators <br />