| RATES AND CHARGES 
<br />Water 
<br />Minimum Charge (Includes No Consumption) 
<br />Base Facilities Charge ........................$5.34/ERU 
<br />Customer Charge:...............................1.82/Meter 
<br />Volume Charge,,, ,,,,,„,,,,,,,,,,,,,,,,,,,,,,,,,1.99/1,000 
<br />gallons 
<br />{Vater Production Charge.............................1.72/1,000 
<br />gallons 
<br />Sewer 
<br />Minimum Charge (Includes No Consumption) 
<br />Base Facilities Charge.........................1.53/ERU 
<br />Customer Charge................................1.84/Meter 
<br />*Volume Charge. ..................................... 
<br />,2.86/1,000 gallons 
<br />*Only applied to first 12,000 gallons of Water Consumption on each 
<br />Residential ERU. 
<br />SPECIFIC SERVICE CHARGES 
<br />{Vater Service Connection 
<br />5/8” Meter...................................$345.00 
<br />1" Meter....................................402.00 
<br />1 1/2" Meter ... ................................706.00 
<br />Larger than 1 1/2" Meter ........................Cost 
<br />Plus Overhead 
<br />Sewer Service Connection 
<br />Residential Unit .. .........................$440.00 
<br />Commercial and Other .........................Cost 
<br />Plus Overhead 
<br />Meter Installation 
<br />5/8" Meter....................................115.00 
<br />1" Meter....................................170.00 
<br />1 1/2" Meter ................................... 
<br />440.00 
<br />2" Meter ........ ...........................550.00 
<br />3" 111•9eters and above .........................Cost 
<br />Plus Overhead 
<br />Fire Hydrant Meter...........................15.00 
<br />Reconnect (Turn -on Fee) 
<br />During Working Hours ,,,,,,,,,,,,,,,,,,,,,,,,,,12.00 
<br />After Working Hours...........................21.00 
<br />Meter Reread and Leak Inspection ...................12.00 
<br />Delinquency Charge (Late Payment Processing) ........ 
<br />1.50 Plus 1 1/20 
<br />General Se.._5.. Calls ............................Cost 
<br />Plus Overhead 
<br />Meter Calibration (Meter Testing) 
<br />5/8" Meter.....................................15.00 
<br />1" ;deter... ............................. 
<br />1S.00 
<br />1 1/2" Meter or Larger ..........................Cost 
<br />plus Overhead 
<br />Damage Repair (Repair Water f, Sewer Break),,,,,,,, 
<br />100.00 Plus Cost 
<br />Engineering Services 
<br />Site Plan Review 
<br />Under 40 units without a lif-tstation..... 
<br />50.00 Minimum 
<br />Over 40 units or a develonment with 
<br />liftstation...........................150.00 
<br />Minimum 
<br />APPENDIX "A" 
<br /> |