My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-18
CBCC
>
Ordinances
>
1980'S
>
1984
>
1984-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 12:00:26 PM
Creation date
2/1/2017 12:31:15 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1984-18
Adopted Date
04/04/1984
Ordinance Type
Water and Sewer
State Filed Date
04\27\1984
Entity Name
Sewer Connections
Impact Fees
Subject
Utilities (Water and Sewer) Connections
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V *w; <br />equivalent residential units. <br />(e) Hotel and Motel. Any building or groups of build- <br />ings containing sleeping room accommodations for guests and pro- <br />viding the services generally provided by a hotel or motel and <br />recognized as a hotel or motel in :he community in which it is <br />situated or by the industry, and offering daily or weekly rates, <br />with a bath or connecting bath for every rental unit and occupied <br />i <br />only by transient guests. It is the intent of this section that <br />any such.structure offering a residential or combination of rooms <br />for rent or lease for longer than a month at a time shall not be <br />considered a hotel or motel. <br />SECTION 7 <br />RATES AND CHARGES <br />t The rate schedule attached hereto as Appendix "A" is <br />hereby adopted by the Board of County Commissidners. <br />A. Base Facilities Charge. This charge shall apply to <br />every connected equivalent residential unit and to each equivalent <br />residential unit reserved for future use in a development. For <br />facilities that have received a Certificate of occupancy this <br />charge will apply until the facility is permanently disconnected <br />from the system. For developments which have entered into an <br />agreement with the County for the construction of the necessary <br />lines to connect the project to the County system, the fee shall <br />commence upon certification by appropriate governmental authori- <br />ties that the lines are ready for use. For all other reserva- <br />tions, the fee shall commence at the time of reservation. For <br />temporary disconnections, customers will pay the base facilities <br />charge for each month the facility is disconnected at the time of <br />reconnection. All individuals who have reserved capacity at the <br />date of enactment of this section shall be given the option of <br />commencing payment of the base facilities charge or to relinquish <br />the reservation and receive a refund of all funds collected by <br />County for the reservation. This election must be made within <br />thirty (30) days of notification by the County. <br />B. Water Production Charge. This charge represents the <br />cost associated with the production of water at the County water <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.