My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.08 Sod Handling and Installation <br />During delivery, prior to planting and during the planting of the lawn areas, the sod panels shall <br />at all times be protected from excessive drying and unnecessary exposure of the roots to the sun. <br />All sod shall be stacked during construction and planting so as not to be damaged by sweating or <br />excessive heat and moisture. <br />After completion of soil conditioning as specified above, sod panels shall be laid tightly together <br />so as to make a solid sodded lawn area. On mounds and other slopes, the long dimension of the <br />sod shall be laid perpendicular to the slope. Immediately following sod laying the lawn areas <br />shall be rolled with a lawn roller customarily used for such purposes and then thoroughly <br />watered. <br />Sufficient watering shall be done by the Contractor to maintain adequate moisture for optimum <br />development of the lawn areas. Freshly sodded areas shall receive no less than 1.5 inches of <br />water per week. <br />2.4-6 <br />4116571114.1847 <br />
The URL can be used to link to this page
Your browser does not support the video tag.