Laserfiche WebLink
expansion to a maximum leachate production of 16,000 gpd, and a total leachate flow of <br />23,000 gpd. The existing leachate pump station system with a capacity of 350 gpm (2 <br />pumps each at 350 gpm, 27 feet total dynamic head) is sufficient to handle the lateral <br />expansion area. <br />Collected leachate is currently managed by forcemain conveyance to the Indian River <br />County Utilities West Subregional Wastewater Plant. The leachate forcemain was <br />installed in 1993. The leachate pump station and force main is manufactured by the <br />Indian River County Utilities Department. If wastewater treatment regulations become <br />more stringent or pretreatment is required, the SWDD will investigate and implement <br />appropriate pretreatment onsite. The SWDD has obtained a leachate surge tank, which <br />is currently stored onsite. The surge tank is not installed and could be used for <br />pretreatment, in the future, if necessary. <br />Stormwater Controls <br />Operation of the existing stormwater system is discussed in Section 62-701.500(10) of <br />the operations plan. <br />F-10 <br />