My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br />1 <br />along the north boundary of Segment 2, one along the south edge of Segment 2, and <br />two wells adjacent to and east of Segment 2. The location of existing gas monitoring <br />wells are shown on Figure 3-3 (plot plan) of the infill expansion permit application. <br />The south boundary of the landfill is approximately 1,200 feet from the Segment 1 and • <br />Segment 2 filled area. The stormwater management ponds located south of the filled <br />areas buffer the site boundary, and no gas monitoring wells are proposed along the <br />south border for the next 10 years. If a Class 1 landfill is constructed (10 plus years into <br />the future) in the south central part of the site, gas monitoring may be required due to <br />the proximity of the Indian River Correctional Facility. <br />Current state and federal regulations require quarterly monitoring of methane <br />concentration in enclosed structures located on the landfill. Enclosed structures on the <br />landfill include the existing scalehouse, landfill office, storage building (next to the <br />HHW facility) and enclosed sheds. The planned administration/maintenance building <br />will also require quarterly monitoring when completed, and occupied. Results of <br />methane monitoring shall be submitted to the FDEP quarterly. <br />vi2053 <br />F-24 <br />r.ITA .. Wig@IT`Z°.',hM. ati% 'I..''9 oFf : . yr??¢..1. 7M.°1�,N"U` :` "•'�.r `�F. <br />-'t - • <br />* .. . _ .:. w ^$' t ,a.., , '1 ; A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.