My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(j) Authority to Execute Contract. <br />(k) Acknowledgment of Addenda. <br />(1) Estimated Monthly Draw Schedule for Construction Payments <br />B-13 SELECTION PROCESS <br />Indian River County's Request for Proposal evaluation process was created for the purpose of <br />selecting contractors in a fair and uniform manner, that those selected for work are qualified and <br />experienced in operating and constructing the facilities desired and to provide every qualified <br />contractor an equal opportunity to be considered for providing services for the Project. <br />The annual Contract Operations price (Base Bid Item No. 1) and the Total Construction price <br />(Base Bid Item No. 2) will be evaluated by determining the lowest Present Worth and will be <br />calculated as follows: <br />• Assume CPI - 3% annually <br />• Assume Discount Rate - 6.41% annually <br />• The Present Worth of each Proposer will be the sum of: <br />Year 1: Base Bid Item No. 1 = $ <br />Year 2: 0.939761 x (1+[0.75 x 0.03]) x Base Bid Item No. 1 = $ <br />Year 3: 0.883151 x (1+[0.75 x 0.03])2 x Base Bid Item No. 1 = $ <br />Year 4: 0.829951 x (1+[0.75 x 0.03])3 x Base Bid Item No. 1 = $ <br />Year 5: 0.779956 x (1+[0.75 x 0.03])4x Base Bid Item No. 1 = $ <br />Construction Capital Cost - Bid Item No. 2 = $ <br />Total Present Worth of Operations for 5 years <br />and Construction Capital Cost = $ <br />The Selection Committee shall evaluate the proposals using the rating scale below. The rating <br />scale consists of 0-1.0 by tenths of a point. The rating will be multiplied by the weighted factor <br />to give a weighted score. The ratings are as follows: <br />1.0 <br />0.9 <br />0.8 <br />0.7 <br />Baling& <br />Superior, far exceeds expectation <br />Excellent, well exceeds expectation <br />0.6 Good, above average <br />0.5 Average <br />0.4 Fair <br />0.3 <br />0.2 <br />0.1 <br />0.0 <br />Poor <br />Non-responsive. Unacceptable <br />B-13 <br />WwNL <br />q).:4K'il: f:' , <br />M1::,e- <br />�. MJF <br />bp0617/10-2097 <br />
The URL can be used to link to this page
Your browser does not support the video tag.