My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dE <br />• <br />034: la1.iY <br />Ai' <br />yw <br />Terraces are provided on the sideslopes of the Segment 1 and proposed for closure of <br />the infill segment and Segment 2 to minimize the length of overland flow and reduce <br />flow velocities. The terraces on the infill segment and Segment 2 are sloped inward <br />toward the upper sideslopes, creating shallow ditches. The terrace ditches convey <br />stormwater runoff to the inlet risers and down the letdown pipes. The grassed terraces <br />must be well maintained with vigorous growing grass to retard sideslope flow and to <br />hold the transitional edge to steeper sideslopes. The terraces should be inspected at <br />least quarterly, or after a four -inch rainfall event and repaired as needed. Terrace <br />mowing should be performed as needed to maintain a vigorous Pensacola bahia grass <br />cover. <br />Letdown Structure Inspection and Maintenance <br />Stormwater management for the north, south, and east sideslopes closed Segment 1 is <br />accomplished by terrace ditches on the benches located at elevation 40, 60, and 80 feet <br />NGVD. The terrace ditches flow to two open flume letdown channels located on the <br />northwest nd southwest corners. The top surface is drained by the closed conduit <br />system located on the southeast corner. Eight closed conduits will be used for the <br />closure of Segment 2. An additional two closed conduit letdown pipes will be installed, <br />one on each of the north and south slopes of the lateral expansion area between <br />Segment 1 and Segment 2. <br />Section -mat -lined terrace ditches on Segment 1 flow to the open flume letdown <br />channels. The flumes, located on the northwest and southwest corners of Segment 1 are <br />lined with concrete filled soil mat for erosion protection. The Segment 1 flume letdown <br />structures terminate at the bottom ditch. The bottom ditch is also lined with concrete - <br />filled section mat and riprap for erosion protection. <br />Cs?zS7:-ua'J k..�et t.. m{ <br />;: <br />th <br />F-37 <br />! L, 'tf.'.'4{•);�: �Nl��l~•fJiFi .Y TON,'�`�'.j1'F11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.