Laserfiche WebLink
however, the Contractor must operate in conformance with the requirements for the Class I <br />Operations permit. If changes occur in the permit requirements, the County will issue a Change <br />Order to the Contract. Compensation for any resulting cost impact on the Contractor will be <br />determined by negotiation following substantiation of additional costs . Only direct costs and <br />overhead without profit are recoverable by Contractor through negotiation. The Contractor shall <br />also be responsible for compliance with applicable Federal, State, and municipal laws, codes, and <br />regulations in connection with performance of the Work. The Contractor shall be responsible for <br />all damage to persons or property that occurs or is a result of his fault or negligence. He shall <br />take proper safety and health precautions to protect the County, the public, and the property of <br />others, including securing insurance as specified. <br />SC -14 PROPERTY DAMAGE <br />The Contractor shall be responsible for the protection of existing facilities including structures, <br />pavement, and drainage ways, on the County's landfill facility property or on adjacent County - <br />owned lands, should the Contractor's purchase borrow from the County. Any damage to <br />property resulting from actions of the Contractor or his employees shall be restored or repaired at <br />the Contractor's expense to the satisfaction of the County. Failure by the Contractor to correct <br />the damage will result in the County's making the necessary corrections and deducting the cost <br />hereof from money due to the Contractor. The Contractor shall not be responsible for property <br />damage caused by the County. <br />SC -15 ASSIGNMENT AND SUBCONTRACTING <br />The Contractor agrees that he will not assign or transfer this Contract nor any right in or claim he <br />may have thereunder, except as expressly authorized in writing by the Board of County <br />Commission Chairman or his designee, and the Contractor further agrees that he will not enter <br />into any Contract with any other party for furnishing any of the Work herein contracted for, <br />except as provided herein, without the written acceptance of the Board of County Commission <br />Chairman or his designee. These provisions will not be taken as requiring acceptance of <br />contracts of employment between the Contractor and his employees assigned for services <br />hereunder. <br />SC -16 INSPECTION OF VEHICLES AND EQUIPMENT <br />The County shall require the Contractor to perform a complete inspection of the general <br />mechanical safety condition of all vehicles and landfill equipment at reasonable times during the <br />term of the Contract. Should any vehicle, when inspected by the Contractor, not comply with the <br />standards of repair and safety established by the provisions of Federal, State and local laws, <br />relating to vehicle registration or applicable state inspection regulations, the Contractor shall <br />repair such vehicle to meet these provisions before it is placed back in service. Contractor shall <br />report the deficiency to the County and repair and replace equipment as needed to continue Class <br />I Operations. <br />SC -4 <br />bP065e101/I. 7 <br />