My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-17
CBCC
>
Ordinances
>
1980'S
>
1988
>
1988-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 12:52:47 PM
Creation date
2/8/2017 12:22:25 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1988-17
Adopted Date
04/11/1988
Ordinance Type
Zoning
State Filed Date
04\15\1988
Entity Name
Dune vegetation protection
Subject
Coastal Management and Shoreline Protection
Codified or Exempt
Codified
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 88 - <br />seaward of the County Dune Stabilization Line. Said zone may <br />extend to a line up to fifteen (15) feet seaward of the dune <br />stabilization line but may not extend more than oX//Vp(//kb <br />fifteen (15) feet seaward of said <br />40tif1XX04/MeA/Wew/to/ /cWs/VWCYkMQV /961/ 10t <br />structure. The purpose of the <br />leeway zone is to provide for temporary encroachment of workers <br />and equipment seaward of the Dune Stabilization Line necessary <br />for construction activity. All proposed activity within the <br />fifteen (15) foot leeway zone shall be described in writing and <br />submitted to the Environmental Planner. Such written request <br />for authorization of a leeway zone tip to 15 feet in depth shall <br />include a vegetation survey that accurately locates and identi- <br />fies all vegetation within an area between the County Dune <br />Stabilization Setback Line and a line twenty (20) feet seaward <br />of that line as well as a plan for revegetating and maintaining <br />the leeway zone with natural indigenous dune vegetation. No <br />permanent improvement or structure may be made in the leeway <br />zone and, prior to encroachment therein, a temporary barrier <br />running parallel to the Coastal Construction Control Line or <br />County Dune Stabilization Setback Line shall be placed at the <br />most seaward extent of the leeway zone to identify the limits <br />beyond which no encroachment of any kind may occur; provided, <br />however, all activities related to construction of an approved <br />dune crossover or elevated bridge shall be governed by authori- <br />zation of the Department of <br />Natural Resources, Bureau of Beaches and Shores, or its succes- <br />sor. <br />�OAO/x/1/1/Nof %"MXiXvt$/bks//(Viqf 1V1VQ((%/bb//WYE//0474 <br />A1616A6)bAX/b1Z//+/rilEl/i§�it old/,Elf//8'spa'dNe+!/ArSal/,Shb�k�//�e��(dal�e�d/�Ib�x��< <br />Approvals required under this paragraph may be obtained concur- <br />rently with site plan or subdivision approval, as the case may <br />be, but must be obtained 4yl1AA&/1WQiyt prior to the scheduled <br />CODING: Words underlined are additions; yb�¢al/$Yi¢yf/i�Mt�ld�yi <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.