My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-019
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 12:02:19 PM
Creation date
2/9/2017 12:02:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/07/2017
Control Number
2017-019
Agenda Item Number
12.F.2
Entity Name
Masteller and Moler
Subject
IRC Courthouse Judges
Security Upgrade
Area
IRC Courthouse
Project Number
1621
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- f <br /> rMMASTELLER & MOLER INC. <br /> CIVIL ENGINEERS <br /> EXHIBIT "A" <br /> AMENDMENT#2 TO WO#2 - Masteller & Moler, Inc. <br /> IRC COURTHOUSE JUDGES SECURITY UPGRADE —IRC Project No. 1621 <br /> Professional Engineering Services <br /> This Amendment is intended to provide for final design services for proposed wall aesthetic features <br /> to be implemented per the approved Concepts prepared by our sub-consultant, Lucido & Associates, <br /> for this project. <br /> Scope of Work: <br /> We will coordinate with Lucido & Associates to prepare a design direction plan based on the <br /> approved schematic design perspectives which provides clarity during the bidding process. <br /> Items to be provided and limited to within the design direction plan are aesthetic matching of <br /> the concrete cap, specification of metal architectural detail (from building) and decorative <br /> stucco scoring along with quantity and specification of replacement hedge along base of wall. <br /> We will complete the above-described scope of services for the Lump.Sum fee of$2,875.00. <br /> Upon receipt of executed Amendment No. 2, we shall complete the scope of services for this <br /> project on the following schedule: <br /> Schedule <br /> 1. Project shall be completed as follows: E <br /> i <br /> Task I — Land Surveying Done <br /> Task II — Design (Civil)/Site Plan Application Done <br /> Task III — Design (Structural) Done <br /> Task IV — Electrical Done <br /> Task V — Wall Aesthetics Concept Design Done <br /> Task VI — Wall Aesthetic Final Design 15 Days <br /> Please let me know if you have any questions or concerns <br /> Sincerely, <br /> WT.ELLER& MOLER, INC. <br /> Stephen E. Moler, PE <br /> Vice President <br /> SEM/cab <br /> File#1620 <br /> (1620LG Amend2toW02_17-0123.docx) <br /> 165527 th Street,Suite 2 •Vero Beach, Florida 32960 <br /> Phone: (772)567-5300 • Fax: (772)794-1106 <br /> mastmolr@bellsouth.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.