Laserfiche WebLink
Draft Projected Revenues Septic to Sewer Phase I <br />Year <br />Capital <br />Impact <br />Sales <br />Cost <br />Fees <br />Revenue <br />Recovery <br />1 <br />2 <br />$805,336 <br />$75,4921 <br />$11,210 <br />3 <br />$156,096 <br />$75,492 <br />$22,421 <br />4 <br />$156,096 <br />$75,492 <br />$33,631 <br />5 <br />$161,877 <br />$78,288 <br />$49,409 <br />6 <br />$161,877 <br />$78,288 <br />$56,882 <br />7 <br />$104,064 <br />$50,328 <br />$64,356 <br />8 <br />$104,064 <br />$50,328 <br />$71,830 <br />9 <br />$104,064 <br />$50,328 <br />$79,303 <br />10 <br />$104,0641 <br />$50,328 <br />$86,777 <br />11 <br />$109,859 <br />$53,124 <br />$94,666 <br />10 Year Totals <br />$1,967,3951 <br />$637,4881 <br />$570,485 <br />Annual revenue after year 10 is $94,666 <br />Cost Phase 1 $1,967,395 <br />Improved Properties ERU's = 137 <br />Future Development ERU's = 91 <br />Assumptions: <br />Connection to the system will be mandatory <br />Capital Cost Recovery will include grant funding and mandatory Assessment Fees <br />Phase I construction will be completed in Year 1 <br />improved properties will be required to connect within 5 years of completion of the project <br />For illustration purposes, assume 20% of the improved properties in Phase I connect in each year 2-6 <br />Assume all connections are in month 1 of the corresponding year <br />Assume that the Unimproved Properties (future development ERU's) -will be improved and connect in years 7-11 <br />Assume 20% of the unimproved properties connect each year beginning in year 6 <br />Assume all connections are in month 1 of the corresponding year <br />Year 1 includes $649,240 in grant funding. Years 2 includes connection fees and impact fees for 137 ERU's in month 1 <br />Assume that the average monthly consumption is 7,000 gallons per ERU <br />Assume the utility.billing rates remain the same as they are now <br />Costs and projected connections are subject to change <br />*Phase I costs are for sewer collection lines only. <br />Estimated cost does not include engineering, design, bidding, and construction inspections. <br />Other expenses that may be encountered included obtainment of easements, relocation of lines, <br />upsizing of existing collection lines, lift stations, or retrofitting of the N WWTF. <br />P161 <br />