My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/2016
CBCC
>
Meetings
>
2010's
>
2016
>
12/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 12:03:39 PM
Creation date
2/16/2017 2:28:58 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/20/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SJRWMD Cost Share Funding <br />• Awarded by SJRWMD Board 6/14/2016 <br />• Signed by BCC 10/04/2016 <br />• Up to 33% of construction cost <br />• Grant payable up to maximum $649,240.35 <br />• Total project cost by engineer estimated to be $2,125,000.00 <br />• 21 month grant time period from October 2016 <br />• Other funding sources needed <br />NORTH SEBASTIAN PHASE I - SEPTIC TO SEWER <br />Commercial Area <br />Project'Specifics <br />Unincorporated <br />City, of <br />Total, <br />Comments <br />County. <br />Sebastian <br />Total Number of Parcels = 61 <br />19' <br />42 <br />Total Number of. Potential ERUs = 228 <br />150 <br />78. <br />Total Square Footage (ft2+= 3096343 <br />1711609; <br />1384739. <br />Total Linear Footage of sewer,.main (LF) = 11980, <br />4510 <br />7470 <br />Average Share Combining,ERU, SF, & LF = <br />53% <br />47% <br />Fair Share of the Construction Cost = <br />$1;0,401843 <br />$926,551 <br />Design, permitting& 100%,construction plans_ <br />Funded by Indian River <br />$155;220.00 <br />County -Utilities <br />$.1251=0.00' <br />Funded by Indian River <br />Bidding/Construction Phase Assistance, <br />County -Utilities <br />Phase I, <br />Per Hydraulic <br />Per Square <br />P.er.Linear <br />Construction Cost <br />Share or. Per, ERU <br />Footage <br />Footage <br />(ft2) <br />(LF), <br />Construction <br />1 $1,967,394.70 <br />$8,628.92 <br />$0.64 <br />$164.22 <br />ILI-A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.