My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/2016
CBCC
>
Meetings
>
2010's
>
2016
>
12/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 12:03:39 PM
Creation date
2/16/2017 2:28:58 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/20/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK ORDER NO. 3 <br />NORTH COUNTY SEWER SYSTEM <br />PHASE ONE - BIDDING & CONSTRUCTION SERVICES <br />PREPARATION OF SPECIFICATIONS, BID DOCUMENTS AND CONSTRUCTION ADMINISTRATION./ OBSERVATION SERVICES <br />MANHOUR BREAK DOWN <br />11/812016 <br />NOTE: Task C is a "Not To Exceed" amount and is based on an estimated timeframe of (230) working days or (322) calendar days. According to a reputable utility <br />contractor, the portion of the project along U.S. #1 will require approximately (130) working days to construct due to thelimited construction area and conflicts <br />with existing storm sewer, gas pipeline, and potable water pipeline. This portion of the project will require more time and more frequent on-site engineering visits <br />by the Engineer -of -Record as part of construction observation. <br />File #1422 <br />1422LH menhours_16-1 1 O&Am <br />4 <br />0 <br />Princi al / PE <br />Project Manager <br />Project Inspector <br />Administration <br />$ 175.00 <br />$ 110.00 <br />$ 85.00 <br />$ 60.00 <br />Total Costs <br />Comments <br />Hours <br />Amount <br />Hours <br />Amount <br />Hours <br />Amount <br />Hours <br />Amount <br />Task A - Contract <br />72 <br />$ 12,600.00 <br />$ - <br />$ - <br />80 <br />$ 4,800.00 <br />$ 17,400.00 <br />Specifications & Bid <br />Documents <br />Task B - Bidding <br />35 <br />$ 6,125.00 <br />$. - <br />$ - <br />30 <br />$ 1,800.00 <br />$ 7,925.00 <br />Services <br />Task C - Construction <br />280 <br />$ 49,000.00 <br />76 <br />$ 8,360.00 <br />357 <br />$ 30,345.00 <br />204 <br />$ 12,240.00 <br />$ 99,945.00 <br />Administration / <br />Observation <br />Total (hrs/cost) <br />387 <br />$ 67,725.00 <br />76 <br />$ 8,360.00 <br />357 <br />$ 30,345.00 <br />314 <br />$ 18,840.00 <br />$ 125,270.00 <br />NOTE: Task C is a "Not To Exceed" amount and is based on an estimated timeframe of (230) working days or (322) calendar days. According to a reputable utility <br />contractor, the portion of the project along U.S. #1 will require approximately (130) working days to construct due to thelimited construction area and conflicts <br />with existing storm sewer, gas pipeline, and potable water pipeline. This portion of the project will require more time and more frequent on-site engineering visits <br />by the Engineer -of -Record as part of construction observation. <br />File #1422 <br />1422LH menhours_16-1 1 O&Am <br />4 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.