unanticipated conditions appear in paragraphs 4.02, 4.03, and 4 04 of the General Conditions.
<br /> Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders
<br /> with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in
<br /> the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at
<br /> the Site which was not shown or indicated in the Drawings or Specifications or identified in the
<br /> Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General
<br /> Conditions.
<br /> 4.05 Upon a request directed to the ENGINEER (Michael D. Nixon, P.E. 772-226-1986),
<br /> OWNER will provide Bidder access to the Site to conduct such examinations, investigations,
<br /> explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall
<br /> fill all holes and clean up and restore the Site to its former condition upon completion of such
<br /> explorations, investigations, tests, and studies.
<br /> 4.06 "[This paragraph has been deleted intentionally]"]
<br /> 4.07 It is the responsibility of each Bidder before submitting a Bid to:
<br /> A. examine and carefully study the Bidding Documents, including any Addenda and the other
<br /> related data identified in the Bidding Documents;
<br /> B. VISIT THE SITE AFTER CONTACTING THE ENGINEER (MICHAEL D. NIXON, P.E.,
<br /> ((772) 226-1986) TO MAKE ARRANGEMENTS IN ADVANCE, AND BECOME FAMILIAR WITH
<br /> AND SATISFY BIDDER AS TO THE GENERAL, LOCAL, AND SITE CONDITIONS THAT MAY
<br /> AFFECT COST, PROGRESS,AND PERFORMANCE OF THE WORK;
<br /> C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and
<br /> Regulations that may affect cost, progress, or performance of the Work;
<br /> D. carefully study all reports of explorations and tests of subsurface conditions at or
<br /> contiguous to the Site and all drawings of physical conditions in or relating to existing surface or
<br /> subsurface structures at or contiguous to the Site (except Underground Facilities) which have
<br /> been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General
<br /> Conditions, and carefully study all reports and drawings of a Hazardous Environmental Condition,
<br /> if any, at the Site which have been identified in the Supplementary Conditions as provided in
<br /> paragraph 4.06 of the General Conditions;
<br /> E. obtain and carefully study (or assume responsibility for doing so) all additional or
<br /> supplementary examinations, investigations, explorations, tests, studies, and data concerning
<br /> conditions (overhead, surface, subsurface, and Underground Facilities) at or contiguous to the
<br /> Site which may affect cost, progress, or performance of the Work or which relate to any aspect of
<br /> the means, methods, techniques, sequences, and procedures of construction to be employed by
<br /> Bidder, including any specific means, methods, techniques, sequences, and procedures of
<br /> construction expressly required by the Bidding Documents, and safety precautions and programs
<br /> incident thereto;
<br /> F. agree at the time of submitting its Bid that no further examinations, investigations,
<br /> explorations, tests, studies, or data are necessary for the determination of its Bid for performance
<br /> of the Work at the price bid and within the times and in accordance with the other terms and
<br /> conditions of the Bidding Documents;
<br /> G. become aware of the general nature of the work to be performed by OWNER and others
<br /> at the Site that relates to the Work as indicated in the Bidding Documents;
<br /> 00200-Instructions to Bidders REV 04-07