My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> SECTION 00630 -Certificate of Substantial Completion <br /> i <br /> i <br /> Date of Issuance: 20 <br /> OWNER: Indian River County <br /> CONTRACTOR: <br /> CONTRACT FOR: 43RD AVENUE SIDEWALK IMPROVEMENTS FROM AVIATION <br /> BOULEVARD TO AIRPORT DRIVE WEST <br /> Project No.: 1123 <br /> OWNER's Bid No. 2017013 <br /> Project Description: 431 Avenue Sidewalk Improvements from Aviation Boulevard to j <br /> Airport Drive West j <br /> This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br /> to the following specified parts thereof: <br /> I I <br /> i <br /> I <br /> j I <br /> To, <br /> OWNER <br /> And To- <br /> CONTRACTOR <br /> I <br /> The Work to which this Certificate applies has been inspected by authorized representatives of j <br /> OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br /> substantially complete in accordance with the Contract Documents on <br /> I <br /> I <br /> DATE OF SUBSTANTIAL COMPLETION <br /> A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br /> inclusive, and the failure to include an item in it does not alter the responsibility of <br /> CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br /> items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br /> days of the above date of Substantial Completion. <br /> li <br /> I <br /> 00630-Certificate of Substantial Completion REV 04-07 <br /> 00630-1 I <br /> P\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th SL to Airport Dr WesMdmim\bid documentsxMaster Contract <br /> Documents\00630-Certificate of Substantial Completion REV 04.07.doc <br /> 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.