My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> data furnished to OWNER or ENGINEER by the be made in the Contract Price or Contract <br /> I <br /> owners of such Underground Facilities, including Times, or both, to the extent that they are <br /> OWNER, or by others. Unless it is otherwise attributable to the existence or location of any <br /> expressly provided in the Supplementary Conditions: Underground Facility that was not shown or <br /> indicated or not shown or indicated with <br /> 1. OWNER and ENGINEER shall not reasonable accuracy in the Contract <br /> be responsible for the accuracy or com- Documents and that CONTRACTOR did not <br /> pleteness of any such information or data; and know of and could not reasonably have been <br /> expected to be aware of or to have anticipated. <br /> 2. the cost of all of the following will be If OWNER and CONTRACTOR are unable to <br /> included in the Contract Price, and CONTRAC- agree on entitlement to or on the amount or <br /> TOR shall have full responsibility for: extent, if any, of any such adjustment in <br /> Contract Price or Contract Times, OWNER or <br /> a. reviewing and checking all such CONTRACTOR may make a Claim therefor as <br /> information and data; provided in paragraph 10.05. <br /> b. locating all Underground Facilities 4.05 Reference Points I <br /> shown or indicated in the Contract <br /> Documents, A. OWNER shall provide engineering surveys to <br /> establish reference points for construction which in <br /> c. coordination of the Work with the ENGINEER's judgment are necessary to enable <br /> owners of such Underground Facilities, CONTRACTOR to proceed with the Work. CON- <br /> including OWNER, during construction, and TRACTOR shall be responsible for laying out the <br /> Work, shall protect and preserve the established <br /> d. the safety and protection of all such reference points and property monuments, and shall <br /> Underground Facilities and repairing any make no changes or relocations without the prior <br /> damage thereto resulting from the Work. written approval of OWNER. CONTRACTOR shall <br /> report to ENGINEER whenever any reference point or <br /> B. Not Shown or Indicated property monument is lost or destroyed or requires <br /> relocation because of necessary changes in grades or <br /> 1. If an Underground Facility ° is locations, and shall be responsible for the accurate <br /> uncovered or revealed at or contiguous to the replacement or relocation of such reference points or <br /> Site which was not shown or indicated, or not property monuments by professionally qualified <br /> shown or indicated with reasonable accuracy in personnel. <br /> the Contract Documents, CONTRACTOR shall, <br /> promptly after becoming aware thereof and 4.06 Hazardous Environmental Condition at Site <br /> before further disturbing conditions affected <br /> thereby or performing any Work in connection A. Reports and Drawings: Reference is made to <br /> therewith (except in an emergency as required the Supplementary Conditions for the identification of <br /> by paragraph 6.16.A), identify the owner of those reports and drawings relating to a Hazardous <br /> such Underground Facility and give written Environmental Condition identified at the Site, if any, <br /> notice to that owner and to OWNER and ENGk that have been utilized by the ENGINEER in the <br /> NEER. ENGINEER will promptly review the preparation of the Contract Documents. <br /> Underground Facility and determine the extent, <br /> if any, to which a change is required in the B. Limited Reliance by CONTRACTOR on <br /> Contract Documents to reflect.and document Technical Data Authorized. CONTRACTOR may rely <br /> the consequences of the existence or location upon the general accuracy of the "technical data" <br /> of the Underground Facility. During such time, contained in such reports and drawings, but such <br /> CONTRACTOR shall be responsible for the reports and drawings are not Contract Documents. <br /> safety and protection of such Underground Such "technical data" is identified in the <br /> Facility. Supplementary Conditions. Except for such reliance <br /> on such"technical data,"CONTRACTOR may not rely <br /> 2. If ENGINEER concludes that a upon or make any Claim against OWNER, <br /> change in the Contract Documents is required, ENGINEER or any of ENGINEER's Consultants with <br /> a Work Change Directive or a Change Order respect to: <br /> will be issued to reflect and document such <br /> consequences. An equitable adjustment shall <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-13 <br /> F•1Public Works%ENGINEERING DIVISION PROJECTS11123 43rd Ave Sidewalk Improvements 26th Sl.to Airport Dr West\Admim\bid documents\Master Contract Documents\00700- <br /> General Conditions REV 5-10-13.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.