Laserfiche WebLink
and responsibility set forth in paragraph 9 10, and to agree on entitlement to or on the amount or extent, <br /> particularly, but without limitation, during or as a result if any, of any adjustment in the Contract Price or <br /> of ENGINEER's visits or observations of Contract Times, or both, as a result of a Field Order, <br /> CONTRACTOR's Work ENGINEER will not a Claim may be made therefor as provided in <br /> supervise, direct, control, or have authority over or be paragraph 10.05. <br /> responsible for CONTRACTOR's means, methods, <br /> techniques, sequences, or procedures of construction, 9.06 Rejecting Defective Work <br /> or the safety precautions and programs incident <br /> thereto, or for any failure of CONTRACTOR to comply A. ENGINEER will have authority to disapprove <br /> with Laws and Regulations applicable to the or reject Work which ENGINEER believes to be <br /> performance of the Work. defective,or that ENGINEER believes will not produce <br /> a completed Project that conforms to the Contract <br /> 9.03 Project Representative Documents or that will prejudice the integrity of the <br /> design concept of the completed Project as a <br /> A. If OWNER and ENGINEER agree, ENGI- functioning whole as indicated by the Contract <br /> NEER will furnish a Resident Project Representative Documents. ENGINEER will also have authority to <br /> to assist ENGINEER in providing more extensive require special inspection or testing of the Work as <br /> observation of the Work. The responsibilities and provided in paragraph 13 04, whether or not the Work <br /> authority and limitations thereon of any such Resident is fabricated, installed, or completed. <br /> Project Representative and assistants will be as <br /> provided in paragraph 9.10 and in the Supplementary 9.07 Shop Drawings, Change Orders and <br /> Conditions. If OWNER designates another represen- Payments <br /> tative or agent to represent OWNER at the Site who is <br /> not ENGINEER's Consultant, agent or employee, the A. In connection with ENGINEER's authority as <br /> responsibilities and authority and limitations thereon of to Shop Drawings and Samples,see paragraph 6 17. <br /> such other individual or entity will be as provided in the <br /> Supplementary Conditions. B. In connection with ENGINEER's authority as <br /> to Change Orders, see Articles 10, 11, and 12. <br /> 9.04 Clarifications and Interpretations <br /> C. In connection with ENGINEER's authority as <br /> A. ENGINEER will issue with reasonable to Applications for Payment,see Article 14. <br /> promptness such written clarifications or interpreta- <br /> tions of the requirements of the Contract Documents 9.08 Determinations for Unit Price Work <br /> as ENGINEER may determine necessary, which shall <br /> be consistent with the intent of and reasonably A. ENGINEER will determine the actual quanti- ! <br /> inferable from the Contract Documents. Such written ties and classifications of Unit Price Work performed <br /> clarifications and interpretations will be binding on by CONTRACTOR. ENGINEER will review with <br /> OWNER and CONTRACTOR. If OWNER and CON- CONTRACTOR the ENGINEER's preliminary <br /> TRACTOR are unable to agree on entitlement to or on determinations on such matters before rendering a <br /> the amount or extent, if any, of any adjustment in the written decision thereon (by recommendation of an <br /> Contract Price or Contract Times, or both, that should Application for Payment or otherwise). ENGINEER's <br /> be- allowed as a result of a written clarification or written decision thereon will be final and binding <br /> interpretation, a Claim may be made therefor as (except as modified by ENGINEER to reflect changed <br /> provided in paragraph 10.05. factual conditions or more accurate data) upon <br /> OWNER and CONTRACTOR, subject to the <br /> 9.05 Authorized Variations in Work provisions of paragraph 10.05. <br /> A. ENGINEER may authorize minor variations in 9.09 Decisions on Requirements of Contract <br /> the Work from the requirements of the Contract Documents and Acceptability of Work <br /> Documents which do not involve an adjustment in the <br /> Contract Price or the Contract Times and are compati- A. ENGINEER will be the initial interpreter of the <br /> ble with the design concept of the completed Project requirements of the Contract Documents and judge of <br /> as a functioning whole as indicated by the Contract the acceptability of the Work thereunder. Claims, <br /> Documents. These may be accomplished by a Field disputes and other matters relating to the acceptability <br /> Order and will be binding on OWNER and also on of the Work, the quantities and classifications of Unit <br /> CONTRACTOR, who shall perform the Work involved Pdce Work, the interpretation of the requirements of <br /> promptly If OWNER and CONTRACTOR are unable the Contract Documents pertaining to the <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-29 <br /> P\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr west\Admim\bid documents\Master Contract Documents1007D0- <br /> General Conditions REV 5-10-13.doc <br />