perform the Work in such a way that the completed Work will conform to the <br /> Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any <br /> portion thereof, until the cause for such order has been eliminated; however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part of <br /> OWNER to exercise this right for the benefit of CONTRACTOR, any <br /> Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br /> employee or agent of any of them. <br /> SC-13.07 Correction Period <br /> SC-13.07 A. Delete the first sentence of paragraph GC-13.07.A in its entirety and insert the <br /> following sentence in its place <br /> A. If within one year after the date of Final Completion or such longer period of time <br /> as may be prescribed by Laws or Regulations or by the terms of any applicable <br /> special guarantee required by the Contract Documents or by any specific provision <br /> of the Contract Documents, any Work is found to be defective, or if the repair of <br /> any damages to the land or areas made available for CONTRACTOR's use by <br /> OWNER or permitted by Laws and Regulations as contemplated in paragraph <br /> 6.11.A is found to be defective, CONTRACTOR shall promptly, without cost to <br /> OWNER and in accordance with OWNER's written instructions: (i) repair such <br /> defective land or areas, or (ii) correct such defective Work or, if the defective Work <br /> has been rejected by OWNER, remove it from the Project and replace it with Work <br /> that is not defective, and (iii) satisfactorily correct or repair or remove and replace <br /> any damage to other Work, to the work of others or other land or areas resulting <br /> therefrom. <br /> I <br /> SC-13.07 B. Delete paragraph GC-13.07.B in its entirety and insert the following sentence in its <br /> place <br /> B. In special circumstances where a particular item of equipment is placed in <br /> continuous service before Final Completion of all the Work, the correction <br /> period for that item may start to run from an earlier date if so provided in the <br /> Specifications or by Written Amendment. <br /> SC-14.02 Progress Payments <br /> SC-14.02.6.5. Delete paragraph GC-14.02.B.5.d in its entirety and insert the following paragraph <br /> in its place: <br /> d. ENGINEER has actual knowledge of the occurrence of any of the events <br /> s <br /> enumerated in paragraph 15.02.A; or <br /> SC-14.02.B.5. Add the following sentences at the end of paragraph GC-14.02.B.5.- <br /> e. <br /> C-14.02.B.5.e. OWNER has been required to pay ENGINEER additional compensation because <br /> of CONTRACTOR delays or rejection of defective Work; or <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections, tests, or approvals taken after initial failing inspections, <br /> tests, or approvals. <br /> SC-14.02.C.1. Delete paragraph GC-14.02.C.1 in its entirety and insert the following <br /> paragraph in its place: <br /> 00800-8 <br /> 00800-Supplementary Conditions 05-13 rev <br /> 00800 8F•\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr Wast\Admim\bid documents\Master Contract <br /> Documents\00800-Supplementary Conditions 05-13 rev.doc <br />