i <br /> 1 <br /> SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 2. All underground structures known to ENGINEER except service connections <br /> for water, sewer, electric, and telephone are shown. This information is shown <br /> for the assistance of CONTRACTOR in accordance with the best information <br /> available, but is not guaranteed to be correct or complete. The existing utilities <br /> shown on the Contract Drawings are located according to the information <br /> available to the ENGINEER at the time the Drawings were prepared and have <br /> not been independently verified by the OWNER orthe ENGINEER. Guarantee <br /> is not made that all existing underground utilities are shown or that the <br /> locations of those shown are accurate. The locations shown are for bidding <br /> purposes only. Finding the actual location of any existing utilities is the <br /> CONTRACTOR's responsibility and shall be done before it commences any <br /> work in the vicinity. Furthermore,the CONTRACTOR shall be fully responsible <br /> for any and all damages, which might be occasioned by the CONTRACTOR's <br /> failure to exactly locate and preserve any and all underground utilities. The <br /> OWNER or ENGINEER will assume no liability for any damages sustained or <br /> costs incurred because of the CONTRACTOR's operations in the vicinity of <br /> existing utilities or structures, nor for temporary bracing and shoring of same. <br /> If it is necessary to shore, brace, or swing a utility, contact the utility company <br /> or department affected and obtain their permission regarding the method to <br /> use for such work. <br /> 3. Contact the various utility companies which may have buried or aerial utilities <br /> within or near the construction area before commencing work. Provide 48 <br /> hours minimum notice to all utility companies prior to beginning construction. <br /> 4. Schedule and execute all work involving existing utilities in order to minimize <br /> necessary interruption of services. Whenever such interruption is necessary <br /> for completion of the work, notify the ENGINEER and the appropriate utility at <br /> least 48 hours in advance. Perform all work to repair/restore utility service to <br /> the satisfaction of the appropriate utility. Include all costs related to service <br /> maintenance, interruption, and restoration in the appropriate line item in the <br /> Contract. <br /> 5. Where it is necessary to temporarily interrupt house or business services, the <br /> CONTRACTOR shall notify the owner or occupant, both before the interruption <br /> (24-hour minimum), and again immediately before service is resumed. Before <br /> disconnecting and pipes or cables,the CONTRACTOR shall obtain permission <br /> from their owner, or shall make suitable arrangement for their disconnection by <br /> their owner. <br /> 6. Explore ahead of trenching and excavation work and uncover all obstructing <br /> underground structures sufficiently to determine their location, to prevent <br /> damage to them and to prevent interruption of the services which such <br /> structures provide. If CONTRACTOR damages an underground structure, <br /> restore it to original condition at CONTRACTOR's expense. <br /> 7. Necessary changes in the location of the Work may be made by ENGINEER, <br /> to avoid unanticipated underground structures. <br /> 8. If permanent relocation of an underground structure or other subsurface facility <br /> is required and is not otherwise provided for in the Contract Documents, <br /> 01541-3 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr <br /> West\Admim\bid documents\Master Contract Documents\01541 -Protection of Property.doc <br />