My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01630 <br /> SUBSTITUTIONS <br /> 2. Upon receipt of an application for review of a substitution, Engineer will <br /> determine whether the review will be more extensive than a normal shop <br /> drawing review for the specified item. <br /> 3. If the substitution will not require a more extensive review, Engineer will <br /> proceed with the review without additional cost to CONTRACTOR. <br /> 4. If the substitution requires a more extensive review, Engineer will proceed <br /> with the review only after CONTRACTOR has agreed to reimburse Owner <br /> for the review cost. <br /> 5. Engineer may require CONTRACTOR to furnish at CONTRACTOR's <br /> expense additional data about the proposed substitute. <br /> H. Any redesign of structural members shall be performed by, and the plans signed <br /> and sealed by, a Professional Engineer registered in the State of Florida. The <br /> redesign shall be at the CONTRACTOR's expense. Any redesign will require an <br /> extensive review by the Engineer. The CONTRACTOR must agree to reimburse <br /> the Owner for the review cost prior to the Owner's Engineer proceeding with the <br /> design review. The ENGINEER's estimated cost of review shall be provided to the <br /> CONTRACTOR prior to proceeding with the review to allowthe CONTRACTOR the <br /> opportunity to rescind the request. <br /> I. Engineer will be allowed a reasonable time within which to evaluate each proposed <br /> substitution. Engineer will be the sole judge of acceptability and shall have the right <br /> to deny use of any proposed substitution. The CONTRACTOR shall not order, <br /> install, or utilize any substitution without either an executed Change Order or <br /> Engineer's notation on the reviewed shop drawing. Owner may require <br /> CONTRACTOR to furnish at CONTRACTOR's expense a special manufacturer's <br /> performance guarantee(s) or other surety with respect to any substitute and an <br /> indemnification by the CONTRACTOR. ENGINEER will record time required by <br /> Engineer and Engineer's consultants in evaluating substitutions proposed by <br /> CONTRACTOR and in making changes in the Contract Documents occasioned <br /> thereby. Whether or not a proposed substitute is sued, CONTRACTOR shall <br /> reimburse Owner for the charges of Engineer and Engineer's consultants for <br /> evaluating each proposed substitute. <br /> J. Substitute materials or equipment may be proposed for acceptance in accordance <br /> with this Section. In the event that substitute materials or equipment are used and <br /> are less costly than the originally specified material or equipment, than the net <br /> difference in cost shall benefit the Owner and CONTRACTOR in equal proportions. <br /> 01630-3 01630 Substitutions <br /> FA1Pubfic Works\ENGINEERING DIVISION PROJECTS11123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid <br /> documents\Master Contract Documents\01630-Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.