My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> G. It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed, <br /> destroyed, or damaged during construction. Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction. <br /> H. When finished surfaces require cleaning with cleaning materials, use only <br /> those cleaning materials which will not create hazards to health or property <br /> and which will not damage the surfaces. Use cleaning materials only on <br /> those surfaces recommended by the manufacturer. Follow the <br /> manufacturer's directions and recommendations at all times. <br /> I. Keep the amount of dust produced during construction activities to a <br /> minimum. At CONTRACTOR's expense, spray water or other dust control <br /> agents over the areas,which are producing the dust. Schedule construction <br /> operations so that dust and other contaminants will not fall on wet or newly <br /> coated surfaces. <br /> 1.3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion, the OWNER, ENGINEER, INDIAN RIVER FARMS <br /> WATER CONTROL DISTRICT(if applicable) and CONTRACTOR shall review the <br /> site with regards to site cleanup and restoration. Clean and/or restore all items <br /> determined to be unsatisfactory by the OWNER or ENGINEER, at no additional <br /> expense. <br /> + + END OF SECTION + + <br /> i. <br /> 01710 Site Cleanup <br /> 01710-2 <br /> P\Public Works\ENGINEERING DIVISION PROJECTSN 123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr WestWdmim\bid <br /> documentsWtaster Contract Documents\01710-Site Cieanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.