Laserfiche WebLink
SECTION 102 - MAINTENANCE OF TRAFFIC <br /> The work specified in this item shall conform to Section 102 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction with the following <br /> modifications. <br /> A. GENERAL PROVISIONS-DESCRIPTION: The work specified in this Section consists <br /> of maintaining traffic within the limits of the project for the duration of the construction <br /> period, including any temporary suspensions of the work. It shall include the <br /> construction and maintenance of any necessary detour facilities; the providing of <br /> necessary facilities for access to residences, businesses, etc., along the project; the <br /> furnishing, installing and maintaining of traffic control and safety devices during <br /> construction, the control of dust through the use of calcium chloride if necessary, and <br /> any other special requirements for safe and expeditious movement of traffic as may be <br /> called for on the plans. The term, Maintenance of Traffic, as used herein, shall include <br /> all of such facilities, devices and operations as are required for the safety and <br /> convenience of the public as well as for minimizing public nuisance; all as specified in <br /> this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br /> Section. <br /> B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall <br /> present his Maintenance of Traffic Plan at the pre-construction conference. The <br /> Maintenance of Traffic Plan shall indicate the type and location of all signs, lights, <br /> barricades, striping and barriers to be used for the safe passage of pedestrians and <br /> vehicular traffic through the project and for the protection of the workmen. The plan <br /> will indicate conditions and setups for each phase of the Contractor's activities. <br /> When the project plans include or specify a specific Maintenance of Traffic Plan, <br /> alternate proposals will be considered when they are found to be equal to or better <br /> than the plan specified. <br /> In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br /> been approved in writing by the Engineer. Modifications to the Maintenance of Traffic <br /> Plan that become necessary shall also be approved in writing. Except in an <br /> emergency, no changes to the approved plan will be allowed until approval to change <br /> such plan has been received. <br /> The cost of all work included in the Maintenance-of--T-raffic-Plan-shall.be included in-the- <br /> pay item for Maintenance of Traffic. <br /> The Contractor shall be responsible for performing daily inspections, including <br /> weekends and holidays, with some inspections at nighttime, of the installations on the <br /> project and replace all equipment and devices not conforming with the approved <br /> standards during that inspection. The project personnel will be advised of the <br /> schedule of these inspections and be given the opportunity to join in the inspection as <br /> is deemed necessary. <br /> 01025-10 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />