Laserfiche WebLink
i <br /> 2. Acceptable Material: FDOT#4 non-calcareous aggregate,washed and meeting <br /> the requirements of FDOT Standard Specifications for Road and Bridge <br /> Construction, Section 901. <br /> I. Hay Bales: Hay bales shall not be used. <br /> PART 3 - EXECUTION <br /> A. Design, construct, and maintain the pollution control and treatment system to minimize <br /> erosion and capture and remove pollutants from the construction site and from all <br /> other areas disturbed by construction activities. <br /> B. Apply polyacrylamide in strict accordance with the polyacrylamide j <br /> manufacturer/supplier's recommendations and specifications. <br /> C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and <br /> regardless of the state of completion of the Work, immediately clean all dirt and debris <br /> from all pipes and drainage structures; and repair all flooding, washouts, and all other <br /> erosion damage to the Work. This responsibility shall not end until Final Acceptance <br /> of the Work by the OWNER. Included is damage caused by erosion of any kind (e.g. <br /> wind, waves, stormwater runoff, hurricanes, etc.) including Acts of God. Restore all <br /> erosion damaged areas to design grades and elevations. Also, refer to General <br /> Conditions 6.13.B. <br /> Item of Payment j <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No. 104-1 — Erosion & Water Pollution Control — Per Lump Sum <br /> [The remainder of this page was left blank intentionally] <br /> 01025-18 Technical Specifications <br /> F:\Pubric Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admlm\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />