My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> exceed a target temperature of 330°F for PG 76-22 (PMA) and PG 76-22 (ARB) asphalt <br /> binders, and 315°F for unmodified asphalt binders. <br /> 9. Provide the physical properties achieved at four different asphalt binder <br /> contents. One shall be at the optimum asphalt content, and must conform to all specified <br /> physical requirements. <br /> 10. The name of the mix designer. <br /> 11. The ignition oven calibration factor. <br /> 12. The warm mix technology, if used. <br /> 334-4 Process Control. <br /> Assume full responsibility for controlling all operations and processes such that the <br /> requirements of these Specifications are met at all times. Perform any tests necessary at the <br /> plant and roadway to control the process. <br /> 334-5 General Construction Requirements. <br /> 334-5.1 Weather Limitations: Do not transport asphalt mix from the plant to the <br /> roadway unless all weather conditions are suitable for the paving operations. <br /> 334-5.2 Limitations of Paving Operations: <br /> 334-5.2.1 General: Spread the mixture only when the surface upon which it is to <br /> be placed has been previously prepared, is intact, firm, dry, clean, and the tack, with <br /> acceptable spread rate, is properly broken. Ensure all granular base materials are properly <br /> rimed and all asphalt base materials are properly tacked, prior to paving. I <br /> 334-5.2.2 Air Temperature: Place the mixture only when the air temperature <br /> in the shade and away from the artificial heat meets the requirements of Table 334-4. The <br /> minimum ambient temperature requirement may be reduced by 5°F when using a warm <br /> mix technology, if mutually agreed to by both the Engineer and the Contractor. Table 334- <br /> 4 <br /> Ambient Air Temperature Requirements for Paving <br /> Layer Thickness or Asphalt Binder Type Minimum Temperature °F <br /> <1 inch 50 <br /> Any mixture > 1 inch containing a PG asphalt binder with a 45 <br /> high temperature designation > 76°C <br /> Any mixture > 1 inch containing a PG asphalt binder with a 40 <br /> high temperature designation < 76°C <br /> 334-5.3 Mix Temperature: Heat and combine the ingredients of the mix in such a <br /> manner as to produce a mixture with a temperature at the plant and at the roadway, within <br /> a range of plus or minus 30°F from the target temperature as shown-on the mix.design. <br /> Reject all loads outside of this range. For warm mix asphalt, the Contractor may produce <br /> the first five loads of the production day and at other times when approved by the <br /> Engineer, at a hot mix asphalt temperature not to exceed .330°F for purposes of heating <br /> the asphalt paver. For these situations, the upper tolerance of+30°F does not apply. <br /> 334-5.4 Transportation of the Mixture: Transport the mix in trucks of tight <br /> construction, which prevents the loss of material and the excessive loss of heat and <br /> previously cleaned of all foreign material. After cleaning, thinly coat the inside surface of the <br /> truck bodies with soapy water or an asphalt release agent as needed to prevent the mixture <br /> from adhering to the beds. Do not allow excess liquid to pond in the truck body. Do not use a <br /> 01025-39 Technical Specifications <br /> R\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport or West\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.