Laserfiche WebLink
i <br /> i <br /> exceed a target temperature of 330°F for PG 76-22 (PMA) and PG 76-22 (ARB) asphalt <br /> binders, and 315°F for unmodified asphalt binders. <br /> 9. Provide the physical properties achieved at four different asphalt binder <br /> contents. One shall be at the optimum asphalt content, and must conform to all specified <br /> physical requirements. <br /> 10. The name of the mix designer. <br /> 11. The ignition oven calibration factor. <br /> 12. The warm mix technology, if used. <br /> 334-4 Process Control. <br /> Assume full responsibility for controlling all operations and processes such that the <br /> requirements of these Specifications are met at all times. Perform any tests necessary at the <br /> plant and roadway to control the process. <br /> 334-5 General Construction Requirements. <br /> 334-5.1 Weather Limitations: Do not transport asphalt mix from the plant to the <br /> roadway unless all weather conditions are suitable for the paving operations. <br /> 334-5.2 Limitations of Paving Operations: <br /> 334-5.2.1 General: Spread the mixture only when the surface upon which it is to <br /> be placed has been previously prepared, is intact, firm, dry, clean, and the tack, with <br /> acceptable spread rate, is properly broken. Ensure all granular base materials are properly <br /> rimed and all asphalt base materials are properly tacked, prior to paving. I <br /> 334-5.2.2 Air Temperature: Place the mixture only when the air temperature <br /> in the shade and away from the artificial heat meets the requirements of Table 334-4. The <br /> minimum ambient temperature requirement may be reduced by 5°F when using a warm <br /> mix technology, if mutually agreed to by both the Engineer and the Contractor. Table 334- <br /> 4 <br /> Ambient Air Temperature Requirements for Paving <br /> Layer Thickness or Asphalt Binder Type Minimum Temperature °F <br /> <1 inch 50 <br /> Any mixture > 1 inch containing a PG asphalt binder with a 45 <br /> high temperature designation > 76°C <br /> Any mixture > 1 inch containing a PG asphalt binder with a 40 <br /> high temperature designation < 76°C <br /> 334-5.3 Mix Temperature: Heat and combine the ingredients of the mix in such a <br /> manner as to produce a mixture with a temperature at the plant and at the roadway, within <br /> a range of plus or minus 30°F from the target temperature as shown-on the mix.design. <br /> Reject all loads outside of this range. For warm mix asphalt, the Contractor may produce <br /> the first five loads of the production day and at other times when approved by the <br /> Engineer, at a hot mix asphalt temperature not to exceed .330°F for purposes of heating <br /> the asphalt paver. For these situations, the upper tolerance of+30°F does not apply. <br /> 334-5.4 Transportation of the Mixture: Transport the mix in trucks of tight <br /> construction, which prevents the loss of material and the excessive loss of heat and <br /> previously cleaned of all foreign material. After cleaning, thinly coat the inside surface of the <br /> truck bodies with soapy water or an asphalt release agent as needed to prevent the mixture <br /> from adhering to the beds. Do not allow excess liquid to pond in the truck body. Do not use a <br /> 01025-39 Technical Specifications <br /> R\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport or West\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />