Laserfiche WebLink
GNP Capital Project Costs <br />During FY 2013/14 to FY 2023/24 <br />Over$10.4 Million <br />Includes: <br />• 45th Street Beautification <br />• 45th Street Resurfacing <br />• 45th Street Lighting <br />• 45th Street Culverting <br />• Improvements to Local Parks <br />• 43rd Avenue Sidewalk <br />• Stormwater Improvements in East Gifford <br />• Signalization Improvements <br />